12
PREPARATORy WORk
© SMA Solar Technology AG Subject to changes to the technical content! Version 1.1 Last updated 04/2021
3.4 Installation location
Necessary requirements
Section “1.5 Intended use“ on page 7 lists all the requirements and conditions for the installation of a
STORAGE-67-TS-10.
When selecting the installation location, also consider the transport routes and the necessary building clear-
ance.
ATTENTION! Damage to the building possible due to static overload.
When fully installed, the battery storage system weighs up to 823 kg. Make absolutely sure that the installation
location has sufficient load-bearing capacity. When in doubt, consult a structural engineer.
Dimensions
≥1
5
185
≥200
≥190
≥65
≥65
60
120
≥130
Space required (includ-
ing installation)
All dimensions in cm.
Additional space required
for service etc.
STOP
STOP
Содержание STORAGE-67-TS-10
Страница 1: ...ENGLISH STORAGE 67 TS 10 Version 1 1 Installation and Operating Instructions STORAGE 67 TS 10...
Страница 51: ......
Страница 52: ...www SMA Solar com...