CONTRACT 4
Annual 'health check' service plus emergency call out within 2 working days
one site visit by engineer to undertake:
calibration / operation check and fit new batteries for DataHog datalogger
Recalibration of 1 sensor annually (for example RH sensor)
Recalibration of 1 sensor biennially (for example solar radiation sensor)
Clean radiation screen to ensure free air flow over sensors
Clean and fit spares and new filter to raingauge
Check total system for integrity
One emergency call out visit within 2 working days
Full telephone support
CONTRACT 5
Biennial or Triennial 'health check' service of WindHog System
one site visit by engineer to undertake:
calibration / operation check of WindHog system
Replacement of Lid Gasket and Gel pack in DataHog2 and Remote Signal
Booster
Replacement of Wind Speed Sensor Bearings (years 2, 4 & 6)
Replacement of Wind Vane Bearings (years 2, 4 & 6)
and Potentiometer (year 6 or year 8)
Clean system (each visit)
Check total system for integrity (each visit)
Full telephone support all year
PLEASE NOTE:
For all maintenance contracts repairs outside manufacturers warranty terms
and conditions and any additional call out visits charged at cost.
38
MiniMet Installation
Содержание MiniMet
Страница 1: ...MiniMet Installation Manual Iss 2 0...
Страница 45: ...APPENDIX 2 CONCRETE BASE FOR A 2M MAST 44 MiniMet Installation...
Страница 46: ...APPENDIX 3 SITE LOCATION 45 MiniMet Installation...
Страница 47: ...APPENDIX 4 ASSEMBLY OF MAST SUPPLIED IN MORE THAN ONE SECTION 46 MiniMet Installation...
Страница 49: ...APPENDIX 6 RAINGAUGE BASEPLATE 48 MiniMet Installation...
Страница 50: ...APPENDIX 7 MOUNTING OF GSM GPRS ENCLOSURE TO BRACKET 49 MiniMet Installation...
Страница 51: ...APPENDIX 8 MOUNTING THE GSM GPRS MODULE ON THE MAST NO SOLAR PANEL 50 MiniMet Installation...
Страница 52: ...APPENDIX 9 MOUNTING OF THE GSM GPRS UNIT ON THE MAST WITH A SOLAR PANEL STEP 1 51 MiniMet Installation...
Страница 53: ...APPENDIX 10 MOUNTING OF THE GSM GPRS UNIT ON THE MAST WITH A SOLAR PANEL STEP 2 52 MiniMet Installation...
Страница 54: ...APPENDIX 11 MOUNTING OF GSM GPRS UNIT ON THE MAST WITH A SOLAR PANEL STEP 3 53 MiniMet Installation...
Страница 55: ...APPENDIX 12 TYPICAL MINIMET INSTALLATION WITH GSM GPRS 54 MiniMet Installation...
Страница 56: ...APPENDIX 13 TYPICAL MINIMET INSTALLATION WITHOUT GSM GPRS 55 MiniMet Installation...
Страница 57: ...APPENDIX 14 56 MiniMet Installation...
Страница 58: ...APPENDIX 15 FITTING THE BATTERY COVER 57 MiniMet Installation...