![Simrad SP60 - REV D Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/simrad/sp60-rev-d/sp60-rev-d_installation-manual_1279232043.webp)
Installation planning
27
851-164574 / C
Figure 3 Sonar room example
Lighting
Minimum load
capacity: 2 tonnes
Bulkhead
steps
Transceiver Unit
Motor Control Unit
(*) = recommended height for
good working conditions
All measurements are in mm.
Min.
3
000
(+
li
ftin
g
de
vi
ce
)
Mi
n.
4
0
00
Air vent pipes
(Minimum diameter
50 mm)
25
1200
(
*)
Mi
n.
810
Pipes
(Diameter 10 mm)
Heater
(CD6380)
Содержание SP60 - REV D
Страница 2: ......
Страница 14: ...Simrad SP60 X 851 164574 C Notes...
Страница 61: ...Transceiver unit 45 851 164574 C Figure 13 Mounting the Transceiver Unit CD3110A...
Страница 203: ...Drawing file 187 851 164574 C 13 3 Installation drawings The SP60 installation drawings are provided on the next pages...
Страница 213: ...Installation remarks 197 851 164574 C Party Date Signature Party Date Signature Party Date Signature...
Страница 214: ...Notes...
Страница 215: ...Notes...
Страница 217: ......