1.5 Supply conditions
Purpose
The following supply conditions are applicable to standard Simrad
SP60 deliveries and associated optional equipment.
Equipment responsibility
The shipyard performing the installation and/or dealer becomes
fully responsible for the equipment upon receipt unless otherwise
stated in the contract.
The duration of responsibility includes:
•
The period of time the equipment is stored locally before
installation.
•
During the entire installation process.
•
While commissioning the equipment.
•
The period of time between commissioning and the final
acceptance of the equipment by the end user (normally the
owner of the vessel which the equipment has been installed).
The Simrad SP60 system guarantee period (as specified in the
contract) begins when the acceptance documents have been signed
unless other arrangements have been made in the contract.
Receipt, unpacking and storage
Upon accepting shipment of the equipment, the shipyard and/or
the dealer should ensure that the delivery is complete and inspect
each shipping container for evidence of physical damage. If this
inspection reveals any indication of crushing, dropping,
immersion in water or any other form of damage, the recipient
should request that a representative from the company used to
transport the equipment be present during unpacking.
All equipment should be inspected for physical damage, i.e.
broken controls and indicators, dents, scratches etc. during
unpacking.
If any damage to the equipment is discovered, the recipient should
notify both the transportation company and Simrad so that Simrad
can arrange for replacement or repair of the damaged equipment.
Once unpacked, the equipment must be stored in a controlled
environment with an atmosphere free of corrosive agents,
excessive humidity or temperature extremes. The equipment must
be covered to protect it from dust and other forms of contamination
when stored.
→
Refer to page 152 for more information concerning environmental
tolerances.
Содержание SP60 - REV D
Страница 2: ......
Страница 14: ...Simrad SP60 X 851 164574 C Notes...
Страница 61: ...Transceiver unit 45 851 164574 C Figure 13 Mounting the Transceiver Unit CD3110A...
Страница 203: ...Drawing file 187 851 164574 C 13 3 Installation drawings The SP60 installation drawings are provided on the next pages...
Страница 213: ...Installation remarks 197 851 164574 C Party Date Signature Party Date Signature Party Date Signature...
Страница 214: ...Notes...
Страница 215: ...Notes...
Страница 217: ......