Testing the peripheral equipment
137
851-164574 / C
10.10 Current meter system
Observe the following procedure to test the Current Meter system
interface.
1
Access the
I/O Setup
menu.
→
A procedure for this is located on page 125.
2
Select
Sensors
in the
I/O Setup
menu, then
Current meter
,
and finally
Kaijo.
3
Observe the
Sensor Config
submenu appears at the bottom
of the menu field.
4
Check that the settings in the
Sensor Config
submenu
correspond to your requirements for the serial line.
5
Press
Close
to exit the
Sensor Config
menu.
6
Select the
Objects
menu, and check that the Buoy readout
(
F
) is shown.
7
Select one of the buoys in the
Objects
menu, and verify that
the buoy data is shown in the dialogue below the menu.
Содержание SP60 - REV D
Страница 2: ......
Страница 14: ...Simrad SP60 X 851 164574 C Notes...
Страница 61: ...Transceiver unit 45 851 164574 C Figure 13 Mounting the Transceiver Unit CD3110A...
Страница 203: ...Drawing file 187 851 164574 C 13 3 Installation drawings The SP60 installation drawings are provided on the next pages...
Страница 213: ...Installation remarks 197 851 164574 C Party Date Signature Party Date Signature Party Date Signature...
Страница 214: ...Notes...
Страница 215: ...Notes...
Страница 217: ......