Start-up procedures
95
851-164336 / D
15
Set the hoisting/lowering switch
S302
to
Stop
position.
Apply 3-phase AC power
You will now apply 3-phase mains power to the hull unit.
1
Reinsert the 3-phase mains fuses for the hull unit in the ship’s
fusebox.
2
Measure the three-phase voltage on the terminals of the
motor overload switch
S301
in the motor control unit.
- Write down the measured voltage here:
Supply voltage (Vac):
WARNING
The mains voltage is lethal. Observe the safety
precautions described in the general safety
rules.
→
Refer to page 10.
Re-wire for 230 Vac 3-phase
The hoist/lower motor is normally pre-wired for 380 / 440 Vac
three-phase. If the measured three-phase voltage is 230 Vac, the
motor must be rewired.
1
Remove the 3-phase mains fuses for the hull unit in the ship’s
fusebox.
2
Remove the cover for the mains connection to the motor.
→
Refer to figure 33 on page 96.
3
Rearrange the motor connections so that they correspond to
the measured voltage.
4
Adjust the release current on the motor overload switch
S301
according to the three-phase voltage:
Hull Unit
230 Vac
380 / 440 Vac
SP70
3.4 A
2.4 A
SP71, SP72, SP73, SP74
10 A
6.5 A
SP75
5.5 A
4 A
5
Reinsert the 3-phase mains fuses for the hull unit in the ship’s
fusebox.
Functional check with power
The hull unit is now all powered up, and the final functional test
can take place.
Содержание Simrad SP70
Страница 2: ......
Страница 14: ...Simrad SP70 X 851 164336 D This page is intentionally left blank...
Страница 62: ...Simrad SP70 46 851 164336 D Figure 13 Mounting the Transceiver Unit CD3110A...
Страница 226: ...Simrad SP70 210 851 164336 D Party Date Signature Party Date Signature Party Date Signature...
Страница 227: ......
Страница 229: ......