Instruction Manual FireGuard 2
Decommissioning/Storage
90
13542E/4
Pos : 181 /Auss erbetriebs etz ung/Lagerung/Tit el 1_1. Auss erb etriebs etz ung / Lag erung @ 0\ mod_1350476819052_20.doc x @ 7618 @ 1 @ 1
12
Decommissioning/Storage
Pos : 182 /Auss erbetriebs etz ung/Lagerung/FireGuar d 2/Text _Auss erbetriebs etz ung_ F G 2_VG 2 @ 4\ mod_1439884889924_20.doc x @ 21420 @ 2 @ 1
12.1
Decommissioning the photometer
The aim of decommissioning is to prepare the individual components of the system properly
for storage.
WORKSTEP
ADDITIONAL INFO / IMAGES
1.
Interrupt the service voltage.
2.
Remove the electrical connections.
Section 5
3.
Remove the FireGuard 2 from the measuring
position and clean thoroughly.
4.
Remove all other components.
5.
Close all openings on the components.
Pos : 183 /Auss erbetriebs etz ung/Lagerung/FireGuar d 2/Text _Lager ung FireG uar d 2 @ 4 \ mod_1452608679390_20. doc x @ 22916 @ 2 @ 1
12.2
Storing the photometer
There are no special requirements for storing the instruments. However, please note the
following information:
The FireGuard 2 and the belonging components contains electronic parts. Storage for
such components must fulfill the usual conditions. It is important to note that the stor-
age temperature must be between -30 and +55 °C.
All components that come into contact with the sample during operation have to be dry
and clean for a long time before being put into storage.
The measuring equipment with all of the accessory parts must be protected against
weather factors, condensing humidity and aggressive gases during storage.
Pos : 184 /---Seit enumbruc h--- @ 0\ mod_1341482862121_0. doc x @ 4073 @ @ 1
Содержание FireGuard 2 Integral
Страница 3: ......
Страница 6: ...Instruction Manual FireGuard 2 Contents 6 13542E 4 This page is intentionally blank ...
Страница 101: ......