Servicing
Instruction Manual FireGuard 2
13542E/4
75
WORKSTEP
ADDITIONAL INFO / IMAGES
5.
Clean the sample heaters.
Only carry out this step if sample heaters
are present.
5.1: Let the sample heaters (Figure 31, pos. 4)
cool down first.
The sample heater can reach tempera-
tures of up to 80 °C!
5.2: Pull the sample heaters (Figure 31, pos. 4)
from the measuring cell inserts (Figure 31,
pos. 3).
5.3: Using your thumb (see arrow in figure be-
low), push the heating element (B) out of the
insulating shell (A).
5.4. Clean the heating element with the brush.
The heating element can be disassembled into
the following two elements:
C: Heating body 1
D: Heating body 2
Do not use moisture when cleaning the
heating elements.
5.5: Assemble the two heating elements (C)
and (D) together with the sample heater. Pay
attention to the pins (circles).
Содержание FireGuard 2 Integral
Страница 3: ......
Страница 6: ...Instruction Manual FireGuard 2 Contents 6 13542E 4 This page is intentionally blank ...
Страница 101: ......