Decommissioning/Storage
Instruction Manual ColorPlus 3
14501E/2
73
12
Decommissioning/Storage
12.1
Decommissioning the photometer
The aim of decommissioning is to prepare the individual components of the system properly
for storage.
WORKSTEP
ADDITIONAL INFO / IMAGES
1.
Interrupt the service voltage to the instrument.
2.
Stop the sample flow and let the measuring
cell run empty.
3.
Remove the electrical connections on the con-
trol unit.
Section 5
4.
Remove the control unit and pack for storage.
5.
Remove the instrument.
6.
Clean and dry the instrument.
7.
Clean and dry the measuring cell.
8.
Close all openings on the photometer.
9.
Close all openings on the measuring cell.
12.2
Storing the photometer
There are no special requirements for storing the instruments. However, please note the
following information:
The system contains electronic components. Storage for such components must fulfill
the usual conditions. It is important to note that the storage temperature must be be-
tween -20 and +50 °C.
All components that come into contact with the sample during operation have to be dry
and clean for a long time before being put into storage.
The measuring equipment with all of the accessory parts must be protected against
weather factors, condensing humidity and aggressive gases during storage.