&RQWHQWV
S7-300 Automation System, Hardware and Installation: CPU 31xC and CPU 31x
A5E00105492-03
ix
9-1
Recommended commissioning procedure - part I: Hardware ......................9-2
9-2
Recommended commissioning procedure - part II: software .......................9-3
9-3
Possible causes for the CPU memory reset request ..................................9-13
9-4
Procedure for resetting the CPU memory...................................................9-13
9-5
Operations in the CPU during a memory reset ...........................................9-15
9-6
Software requirements ................................................................................9-22
9-7
DP address areas of the CPUs ...................................................................9-23
9-8
Event recognition by CPUs 31x-2 DP/31xC-2 DP as the DP master .........9-25
9-9
Event recognition for CPUs 31x-2 DP/31xC-2 DP as the DP slave............9-28
9-10
Configuration example for the address areas in intermediate memory .....9-29
10-1
Back-up of operating system on MMC .......................................................10-2
10-2
Updating the operating system with MC/MMC...........................................10-3
11-1
The differences between forcing and modifying variables .........................11-3
11-2
Status and error displays ...........................................................................11-7
11-3
Evaluation of the SF LED (software error) .................................................11-8
11-4
Evaluation of the SF LED (hardware error)................................................11-9
11-5
The BUSF, BUSF1 and BUSF2 LEDs .....................................................11-10
11-6
The BUSF LED lights up. .........................................................................11-11
11-7
The BUSF LED flashes ............................................................................11-11
11-8
Event recognition by CPUs 31x-2 as the DP master ...............................11-14
11-9
Evaluation in the DP master of RUN to STOP transitions by the
11-10
Reading the diagnostic information using STEP 5 and STEP 7
in the masters system ..............................................................................11-16
11-11
Event recognition by CPUs 31x-2 acting as the DP slave .......................11-20
11-12
Evaluation of RUN to STOP transitions in the DP master/DP slave........11-20
11-13
Structure of station status 1 (byte 0) ........................................................11-23
11-14
Structure of station status 2 (byte 1) ........................................................11-23
11-15
Structure of station status 3 (byte 2) ........................................................11-24
11-16
Structure of the master PROFIBUS address (byte 3) ..............................11-24
11-17
Structure of the vendor ID (byte 4, 5).......................................................11-24
12-1
Starting the system after specific events....................................................12-1
12-2
Mains voltage .............................................................................................12-2
12-3
Protection against external electrical interference .....................................12-2
12-4
Protection against external electrical interference .....................................12-2
12-5
Coupling mechanisms................................................................................12-4
12-6
Key to example 1......................................................................................12-10
12-7
Routing cables inside buildings................................................................12-15
12-8
High-voltage protection of cables with surge voltage protection
components..............................................................................................12-21
12-9
Surge voltage protection components for lightning protection
zones 1 <-> 2 ...........................................................................................12-23
12-10
Surge voltage protection components for lightning protection
zones 2 <-> 3 ...........................................................................................12-24
12-11
Example of a lightning-protected structure (key to figure above) ............12-26
Содержание CPU 312
Страница 10: ... RQWHQWV S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x x A5E00105492 03 ...
Страница 76: ... RQILJXULQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 5 50 A5E00105492 03 ...
Страница 146: ... RPPLVVLRQLQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 9 34 A5E00105492 03 ...
Страница 232: ... ORVVDU S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 13 16 A5E00105492 03 ...