,QVWDOODWLRQ
S7-300 Automation System, Hardware and Installation: CPU 31xC and CPU 31x
6-4
A5E00105492-03
3UHSDULQJWKHPUDLOIRULQVWDOODWLRQ
1. Cut the 2 m rail to the required length.
2. Mark out:
–
four bores for the fixing screws (for dimensions refer to "Dimensions for
fixing holes")
–
one hole for the protective conductor bolt.
3. If the length of your rail exceeds 830 mm, you must stabilize it by providing
additional holes for fixing it with more screws.
Mark out these holes along the groove in the middle section of the rail (see the
Figure below). The pitch should be approx. 500 mm.
4. Drill the marked holes to a diameter of 6.5
+0.2
mm for M6 screws.
5. Attach an M6 screw for fixing the ground conductor.
3
4
5
2
1
Figure 6-1 Holes for mounting the 2 m rail
.H\WRQXPEHUVLQWKHILJXUH
Hole for ground conductor screw
Groove for drilling additional holes for mounting screws
Hole for mounting screw
Additional hole for mounting screw
Hole for mounting screw
Содержание CPU 312
Страница 10: ... RQWHQWV S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x x A5E00105492 03 ...
Страница 76: ... RQILJXULQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 5 50 A5E00105492 03 ...
Страница 146: ... RPPLVVLRQLQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 9 34 A5E00105492 03 ...
Страница 232: ... ORVVDU S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 13 16 A5E00105492 03 ...