&RPPLVVLRQLQJ
S7-300 Automation System, Hardware and Installation: CPU 31xC and CPU 31x
9-8
A5E00105492-03
3*IRUFRPPLVVLRQLQJRUPDLQWHQDQFH
1. Use a stub cable to connect the commissioning and maintenance PG to the
other subnet nodes. The bus connector of these nodes must be equipped with a
PG socket.
The figure below shows the interconnection of two networked S7-300 and a PG.
SF
BUSF
DC5V
FRCE
RUN
ST OP
SIEMENS
PS
SM
SF
BUSF
DC5V
FRCE
RUN
STOP
SIEMENS
CPU
PS
SM
PG
1
2
2
3
CPU
Figure 9-3 Connecting a PG to a subnet
7KHGLDJUDPLOOXVWUDWHVXQGHUQXPEHU
Stub cable used to create connection between PG and CPU
Inserted terminating resistor of bus connector
PROFIBUS bus cable used to network the two CPUs
Содержание CPU 312
Страница 10: ... RQWHQWV S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x x A5E00105492 03 ...
Страница 76: ... RQILJXULQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 5 50 A5E00105492 03 ...
Страница 146: ... RPPLVVLRQLQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 9 34 A5E00105492 03 ...
Страница 232: ... ORVVDU S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 13 16 A5E00105492 03 ...