:LULQJ
S7-300 Automation System, Hardware and Installation: CPU 31xC and CPU 31x
7-8
A5E00105492-03
1RWH
The PS 307 power supply module is equipped with two additional DC 24 V
connections (L+ and M) for the supply of I/O modules.
:LULQJ)URQW&RQQHFWRUV
,QWURGXFWLRQ
The front connector is used to connect the sensors and actuators of your system to
the S7-300 PLC. Wire the sensors and actuators to this front connector and then
plug it into the module.
)URQWFRQQHFWRUYHUVLRQV
Front connectors come in 20-pin and 40-pin versions, each with screw contacts or
spring terminals. 40-pin front connectors are required for CPUs 31xC and
32-channel signal modules.
You must use the following front connectors, depending on the module:
Table 7-4
Assignment of front connectors to modules
0RGXOH
)URQWFRQQHFWRUVZLWK
VFUHZWHUPLQDOV2UGHU
1R
)URQWFRQQHFWRUVZLWK
VSULQJWHUPLQDOV2UGHU
1R
Signal modules
(not 32-channel),
Function modules,
Communication module
CP 342-2
6ES7 392-1AJ00-0AA0
6ES7 392-1BJ00-0AA0
Signal modules
(32-channel) and
CPU 31xC
6ES7 392-1AM00-0AA0
6ES7 392-1BM01-0AA0
7HUPLQDWLRQZLWKVSULQJWHUPLQDOV
To terminate a conductor in a front connector with spring terminals, simply insert
the screwdriver vertically into the opening with the red opening mechanism, insert
the wire into the terminal and remove the screwdriver.
Содержание CPU 312
Страница 10: ... RQWHQWV S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x x A5E00105492 03 ...
Страница 76: ... RQILJXULQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 5 50 A5E00105492 03 ...
Страница 146: ... RPPLVVLRQLQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 9 34 A5E00105492 03 ...
Страница 232: ... ORVVDU S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 13 16 A5E00105492 03 ...