S7-300 Automation System, Hardware and Installation: CPU 31xC and CPU 31x
A5E00105492-03
12-1
$SSHQGL[
$VVHPEO\
*HQHUDO5XOHVDQG5HJXODWLRQVIRU62SHUDWLRQ
,QWURGXFWLRQ
In view of the many and versatile S7-300 applications, this chapter can only
describe the basic rules on its electrical configuration. You must observe at least
these basic rules if you want your S7-300 to operate free of trouble.
(0(5*(1&<2))GHYLFHV
EMERGENCY-OFF devices to IEC 204 (corresponds to VDE 113) must remain
effective in all operating modes of the plant or system.
6WDUWXSRIWKHV\VWHPDIWHUVSHFLILFHYHQWV
The following table shows you what you have to observe when starting up a plant
again following specific events.
Table 12-1
Starting the system after specific events
,IWKHUHLV
:KDWPXVWQRWKDSSHQ
Restart following a voltage dip or power
failure,
No dangerous operating states may occur. If
necessary, force EMERGENCY-OFF.
Start-up after releasing the EMERGENCY
OFF device:
An uncontrolled or undefined start-up must
be avoided.
Содержание CPU 312
Страница 10: ... RQWHQWV S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x x A5E00105492 03 ...
Страница 76: ... RQILJXULQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 5 50 A5E00105492 03 ...
Страница 146: ... RPPLVVLRQLQJ S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 9 34 A5E00105492 03 ...
Страница 232: ... ORVVDU S7 300 Automation System Hardware and Installation CPU 31xC and CPU 31x 13 16 A5E00105492 03 ...