60
3) Relay (38523 0300), black
(1) Layout and role of relay
When electricity flows to the seat switch timer, the
relay is triggered and the current flows.
When the keys switch is in the START position,
the relay is triggered and the current flows.
When electricity flows to the safety start switch,
the relay is triggered and the current flows to the
glow plug.
(2) Relay test
1. Connect a tester to the relay terminal to check
continuity between D and C.
There should be no continuity.
2. When a voltage of 12V is applied between A and
B, there should be continuity between D and C.
If the conditions detailed in 1. and 2. above are
not met, replace the relay.
4) Seat safety switch timer (38587 0640)
(1) Installation location and operation
The timer
is installed in the location shown in the
figure on the right.
If the driver leaves the seat for 1 second or longer
will operating the mower, this timer stops the flow
of electricity to the engine stop solenoid.
(The engine stops.)
This timer is designed so that the switch will not be
too sensitive to bumpy surface conditions.
Fig.4-2-6
Fig.4-2-4
Fig.4-2-5
Fig.4-2-7
Содержание SG280E
Страница 1: ...SLOPE MOWER 2011 4 MODEL SG280E...
Страница 2: ...1...
Страница 7: ...6 Body and operation areas 1 2 Overall view part names Fig 1 2 1 Fig 1 2 2...
Страница 8: ...7 Fig 1 2 3 Total elapsed time Seat swing lever...
Страница 10: ...9...
Страница 14: ...11 Model N843 2 2 Cross section diagrams Fig 2 2 1...
Страница 15: ...12 Model N843 Fig 2 2 2...
Страница 51: ...48 Section 3 Hydraulic and Power Systems 3 1 Hydraulic system diagram 3 2 Functions 3 3 Power system...
Страница 53: ...50 HST 2WD 4WD 2WD 4WD 2WD 4WD 3 2 Functions Fig 3 2 1...
Страница 59: ...56...
Страница 60: ...56 Section 4 Electric Components 4 1 Layout diagram 4 2 Safety system electric components...
Страница 109: ...105 Section 6 Wiring Diagram 6 1 Wiring diagram...
Страница 110: ...106 6 1 Main circuit diagram...
Страница 111: ...107 Fig 6 1 1...