MX-3114N DISASSEMBLY AND ASSEMBLY 10 – 38
c. Secondary transfer roller
1)
Remove the bearing, and remove the secondary transfer roller.
d. Secondary transfer drive gear
1)
Remove the E-ring and the bearing. Slide the secondary trans-
fer belt drive roller, and remove the parallel pin and the sec-
ondary transfer drive gear.
(4) PTC unit
a. PTC cleaner, PTC wire, PTC cleaner holder
1)
Remove the PTC cleaner.
Check to confirm that the PTC wire is located at the center
between the PTC cleaner holder and the PTC cleaner.
2
1
5
1
2
3
4
No.
Name
1
PTC cleaner
2
PTC wire
3
PTC cleaner holder
2
1
3
Содержание MX-2314N
Страница 47: ...MX 3114N EXTERNAL VIEW AND INTERNAL STRUCTURE 4 21 13 PWB Memory device CPM CPM MACHINE CPM MACHINE ...
Страница 317: ...MX 3114N MAINTENANCE 9 18 11 11 1 6 3 9 10 15 7 8 12 2 4 5 14 ...
Страница 319: ...MX 3114N MAINTENANCE 9 20 1 2 5 5 7 3 6 10 11 8 3 4 2 4 9 ...
Страница 323: ...MX 3114N MAINTENANCE 9 24 2 11 11 13 10 12 3 14 5 6 14 4 7 9 8 1 ...
Страница 335: ...MX 3114N MAINTENANCE 9 36 1 3 20 18 15 15 17 24 19 16 2 4 7 11 24 20 5 22 6 9 12 14 13 10 13 14 23 23 21 6 8 9 12 ...
Страница 337: ...MX 3114N MAINTENANCE 9 38 23 23 1 2 21 21 22 7 6 5 16 8 9 10 13 14 15 24 3 19 16 18 20 17 12 14 10 13 15 11 4 5 4 24 ...
Страница 342: ...MX 3114N MAINTENANCE 9 43 21 23 24 1 6 2 3 5 6 22 24 22 22 6 25 23 4 7 13 8 9 13 12 10 11 14 20 15 16 20 19 17 18 ...
Страница 344: ...MX 3114N MAINTENANCE 9 45 ...