VIDEOSURVEILLANCE SYSTEMS
SENTRY
WAY
®
CT V2 001
Page 55 of 70
System Installation Guide
7.2.1
7.2.2
7.2.3
Clean two connector pieces (Fig. 7-2) and two end plugs (Fig. 7-3), if necessary, with a nonabrasive
cleaning pad, and coat lightly with flux.
Install conductor end plugs in one end of the first two copper conductors (Fig.7-3), and insert the
connector pieces into the opposite end of the tubing as far as they will go.
Using a propane torch, heat areas to be joined until solder flows easily into the joint. While solder
is still molten, wipe off excess solder with a damp cotton rag or sponge. If excess solder or flux is
present, use a plastic non–abrasive pad laid lengthwise along the conductor to remove it.
Uneven solder joints, and / or gaps between conductor ends, will
result in noisy carriage operation, electronic interference, and rapid
destruction of the carriage brushes. If necessary, use a steel file to even
the surface area.
CAUTION
Installation and copper pipe welding tutorial
WARNING: make sure that the copper pipe welding is never in the same place as the rail junctions nor in the
curves
Hang up the copper pipes under the
aluminum sections (For example with
cables)
Make sure the copper pipes are well
aligned by adjusting the lenght of the
support cables
1
2
Содержание CurveTrack
Страница 2: ......
Страница 16: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 16 of 70 System Installation Guide 1 35 m...
Страница 39: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 39 of 70 System Installation Guide...
Страница 52: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 52 of 70 System Installation Guide...