![Sentryway CurveTrack Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/sentryway/curvetrack/curvetrack_system-installation-manual_1245128005.webp)
VIDEOSURVEILLANCE SYSTEMS
SENTRY
WAY
®
CT V2 001
Page 5 of 70
System Installation Guide
Table of Contents
1. INTRODUCTION...............................................................................................................7
1.1 Explanation of Symbols.............................................................................................................................8
1.2 Technical Specifications............................................................................................................................9
1.2.1 Physical Dimensions of the camera carriage..........................................................................................10
1.3 Units of measure.........................................................................................................................................10
1.4 General safety precautions.........................................................................................................................10
1.5 Responsibilities of the Installer.................................................................................................................11
2. IDENTIFICATION OF MAJOR COMPONENTS...............................................................12
2.1 System Components...................................................................................................................................12
2.2 Rail Components........................................................................................................................................14
2.3 Carriage Components................................................................................................................................17
2.4 Power supply assembly (power end cap) Components..............................................................................18
3. SITE EVALUATION AND PLANNING...............................................................................19
3.1 Overview.....................................................................................................................................................23
3.2 Setting Up A Schedule................................................................................................................................21
3.3 Planning Installation of the System Run...................................................................................................21
3.4 Material Inspection and Inventory............................................................................................................22
3.5 Material Storage.........................................................................................................................................22
3.6 Recommended Tool List.............................................................................................................................23
4. SUPPORT STRUCTURE INSTALLATION........................................................................24
4.1 General.......................................................................................................................................................24
4.2 Fastening Support Hardware to Bar Joists—Perpendicular.....................................................................24
4.3 Fastening Support Hardware to Bar Joists—Parallel................................................................................25
4.4 Fastening Support Hardware to Steel Beams—Perpendicular.................................................................26
4.5 Fastening Support Hardware to Steel Beams—Parallel............................................................................27
4.6 Fastening Support Hardware to C–Purlin Beams—Perpendicular..........................................................28
4.7 Fastening Support Hardware to C–Purlin Beams—Parallel....................................................................30
4.8 Fastening Support Hardware to Flush Concrete–Parallel and Perpendicular.........................................31
4.9 Fastening Support Hardware to Reinforced Concrete Beams..................................................................33
5. THREADED ROD INSTALLATION..................................................................................34
5.1 General.......................................................................................................................................................34
5.2 Cutting the Threaded Rod.........................................................................................................................34
5.3 Installing Threaded Rod in Channel for Parallel Runs............................................................................36
5.4 Installing Turnbuckles on Threaded Rods...............................................................................................38
6. RAIL SECTION INSTALLATION.......................................................................................40
6.1 Rail Section Inspection..............................................................................................................................40
6.2 Rail Section Cleaning.................................................................................................................................40
6.3 Rail Section Preparation............................................................................................................................40
Содержание CurveTrack
Страница 2: ......
Страница 16: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 16 of 70 System Installation Guide 1 35 m...
Страница 39: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 39 of 70 System Installation Guide...
Страница 52: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 52 of 70 System Installation Guide...