![Sentryway CurveTrack Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/sentryway/curvetrack/curvetrack_system-installation-manual_1245128035.webp)
VIDEOSURVEILLANCE SYSTEMS
SENTRY
WAY
®
CT V2 001
Page 35 of 70
System Installation Guide
Cut two equal lengths of rod for the first two rail sections in the system run, and cut at least one more length
for each remaining rail section. On C– Purlin and steel beam perpendicular installations that allow the beam
clamps to be mounted in a vertical position, it is possible to run the threaded rod up and through the beam
clamp, eliminating the swivel. Measure to the top of the clamp for this type of installation. Subtract 200mm
from the total length of the threaded rod when using turnbuckles to adjust for the desired length.
Содержание CurveTrack
Страница 2: ......
Страница 16: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 16 of 70 System Installation Guide 1 35 m...
Страница 39: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 39 of 70 System Installation Guide...
Страница 52: ...VIDEOSURVEILLANCE SYSTEMS SENTRYWAY CT V2 001 Page 52 of 70 System Installation Guide...