45
6. Maintenance
instructions
6.1. Explanation
of
test and display test
Use the switches on the VTS to enter the TEST MODE. This will allow you to carry out post installation and
periodic checks and adjustments. The following section details the function of each of the tests:
Be very careful about entering TEST MODE. If the machine you wish to test is
linked to other machines, exiting test on your machine will cause a network check
to be carried out. This will disable all other machines linked to it.
ITEM DESCRIPTION
INTERVAL
INSTALLATION OF
THE MACHINE
When the machine is installed perform the following
checks:
•
Check to see that each setting is as per the standard
settings input at the time of shipment.
•
In the INPUT TEST mode, check each switch and
V.R.
•
In the OUTPUT TEST mode, check each of the lamps.
•
In the MEMORY TEST mode check all of the IC’s on
the IC BD.
Monthly
MEMORY
•
On the TEST MENU screen choosing the MEMORY
TEST allows self test to be performed. In this test
RAM & ROM are tested.
Monthly
PERIODIC CHECKS
Periodically perform the following
•
MEMORY
TEST.
•
Ascertain each setting.
•
In the INPUT TEST mode, test the control devices.
•
In the OUTPUT TEST mode, check each of the lamps.
Monthly
CONTROL SYSTEM
•
In the INPUT TEST mode, check each switch and
V.R.
•
Adjust or replace each switch and V.R.
Monthly
MONITOR
•
In the C.R.T. TEST mode, check to ensure the monitor
is adjusted correctly
•
Clean screen (switch off machine and remove the
plug)
Monthly
Weekly
IC BOARD
MEMORY TEST
•
In the SOUND TEST mode, check the sound related
ROMs
Monthly
DATA CHECK
•
Check such data as held in the bookkeeping screens,
relating to number and length of plays
Monthly
EXTERIOR
MAINTENANCE
•
Clean
surfaces
•
Lubricate
seat
sliders
Note: This appliance shall not be cleaned by a water jet.
Monthly
COIN MECHANISM
•
Check switch operation (if fitted)
Monthly
Содержание HOUSE OF THE DEAD 4 SUPER DELUXE
Страница 18: ...15 Ensure adequate ventilation is maintained as detailed below...
Страница 103: ...100 10 15 Display internal test pattern...
Страница 105: ...102...
Страница 121: ...118 3 Disconnect the two connectors 4 Remove the six screws from the side of the projector...
Страница 124: ...121 9 After exchanging the LED board enter TEST Mode and perform a lighting test...
Страница 144: ...141 17 1 Electrical schematic The following pages contains the electrical schematic for this machine...
Страница 145: ......
Страница 146: ......
Страница 147: ......