14
Step 2 (Leg levelling procedure)
Make sure all of the leg adjusters are in contact with the floor. If they are not the
machine may move and cause injury. This operation requires 2 people.
QUALIFIED SERVICE PERSONNEL should only carry out this operation.
The cabinet is equipped with 8 casters (4 for DLP Base and 4 for Cabinet) and 6 adjusters (4 for DLP Base
and 2 for Cabinet). After deciding on a location, bring the adjusters into direct contact with the ground and
adjust the cabinet so that it is completely level. If the floor is level, the machine should be level with the
casters about 5 millimeters from the floor.
Move the cabinet to the desired location. Make sure there is space in the back for air to flow.
Bring the adjusters into direct contact with the floor. Use a wrench to align the height of the
adjusters until the cabinet is perfectly level.
After making the final adjustments, fix the adjuster height by tightening up the adjuster nuts.
Underside view
After securing the leg adjuster bolts, fully tighten all bolts temporarily attached in step 1 above.
Содержание HOUSE OF THE DEAD 4 SUPER DELUXE
Страница 18: ...15 Ensure adequate ventilation is maintained as detailed below...
Страница 103: ...100 10 15 Display internal test pattern...
Страница 105: ...102...
Страница 121: ...118 3 Disconnect the two connectors 4 Remove the six screws from the side of the projector...
Страница 124: ...121 9 After exchanging the LED board enter TEST Mode and perform a lighting test...
Страница 144: ...141 17 1 Electrical schematic The following pages contains the electrical schematic for this machine...
Страница 145: ......
Страница 146: ......
Страница 147: ......