![SDKELI KS06 AOPD Series Скачать руководство пользователя страница 57](http://html1.mh-extra.com/html/sdkeli/ks06-aopd-series/ks06-aopd-series_operation-manual_1220444057.webp)
- 53 -
Then move the test piece along the edges of the protective field, as shown in figure
②
, the red OFF-
state indicator on the receiver is on. Remove the test piece, the green ON-state indicator on the receiver is
on.
□When use EDM function, if KS06 light curtain is in light-shaded state and the input of the external device
is OFF, the system turns into lockout state.
3.4.Checking that hazardous parts stop while the machine operates
□The hazardous parts stop immediately when a test piece is inserted into the detection zone at 3 positions:
"directly in front of the emitter", "directly in front of the receiver", and "between the emitter and receiver".
(Use the appropriate test piece.)
□The hazardous parts remain stopped as long as the test piece is in the detection zone.
□The hazardous parts stop when the power of KS06 is turned OFF.
□The actual response time of the whole machine is equal to or less than the calculated value.
Fig 3.1 Schematic Diagram of the Test Method of the Test Piece in the Detection Area
WARNING
For presses on which the slide can stop at any point in one stroke, the braking must not have any
failure!
For presses which can only realize upper dead point protection, the machine tool can not have the
clutch failure!
If the braking is at fault, the guarded machine must be repaired!
If the braking of guarded machine is at fault, the KS06 can not protect the operator
.
After wiring, make a detailed check according to nameplate markings and operation manual to
ensure that all the connections are correct; the power supply can be switched on for debugging after the
verification of wiring.
1) The debugging of KS06 AOPD
1. Turn off the power switch, and then energize the machine (all the indicators are off ). Check the power
voltage with multimeter, the value must be in line with the voltage marked on the nameplate(voltage
fluctuation range must not exceed ±10%).
2. For CPSII and CQ2, turn on the power switch, the orange power indicator is on;
3. Beam alignment
First trun on the power switch and turn the function switch to the protection side. Then adjust the positions
of emitter and receiver, make them parallel, corresponding, aligned, until the red status indicator of receiver
is off, the green status indicator of receiver is on, it means the light curtain is unblocked.
4. Test
Shade the light curtain beam by beam. On the receiver, the red status indicator is on, and the green status
indicator is off. On the controller, the green normal operation indicator is off; the red unusual station
.
indicator is on;When the light curtain is unblocked, on the receiver, the red status indicator is off, the green
status indicator is on. On the controller, the green normal operation indicator is on, the red unusual station
indicator is off, and AOPD is ON state.
3.5 Debugging
Содержание KS06 AOPD Series
Страница 2: ...KS06 AOPD Type 4 Operation Manual 2021 02 Jining KeLi Photoelectronic Industrial Co Ltd...
Страница 31: ...27 Bracket arm Steel pipe Bracket seat ZC mounting bracket Upper vibration reducer Lower vibration reducer...
Страница 32: ...28 L bracket KS scatter shield Floor column base Floor scatter shield...
Страница 64: ...60...