![SDKELI KS06 AOPD Series Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/sdkeli/ks06-aopd-series/ks06-aopd-series_operation-manual_1220444053.webp)
- 49 -
2.3.3 Wiring about CQ2 controller
The power cable between controller and the electric equipment of machine is 7 -core cable, in which
the terminal of controller is connected by 12-core connection terminals.
At the time of wiring, connect to AC100 to 230V or DC24V power supply according to the numerical
values marked on the nameplate.
The connection of OSSD, refer to the connection form of CPSII.
In general, NC contacts should not be used as the control contact for safe purpose! If NC
contacts are needed, take out the overload fuse F1/5A first.
The realization of muting function, refer to the connection form of CPSII.
Wiring about CQ2 controller and Emitter/Receiver.
The transmission cables between CQ2 and emitter / receiver are both 5-core shielded cables.
Transmission cable and CQ2 are connected by 14-core terminal, and transmission cable and emitter/
receiver are connected by 7-core multipin connectors.
At the time of wiring, connect the terminals of transmission cable with the correspondingly terminals
of CQ2 according to the wire markings, fasten the compression-joint screw, and then connect the
transmission cable with the emitter and receiver.
If transmission cable or power cable is tightened, the connector may be broken by shock of the
cable. The cable at the end of connector should be relaxed properly after wiring. Refer to Fig 2.29.
CAUTION
Fig 2.23 Wiring illustration of CQ2 controller
Содержание KS06 AOPD Series
Страница 2: ...KS06 AOPD Type 4 Operation Manual 2021 02 Jining KeLi Photoelectronic Industrial Co Ltd...
Страница 31: ...27 Bracket arm Steel pipe Bracket seat ZC mounting bracket Upper vibration reducer Lower vibration reducer...
Страница 32: ...28 L bracket KS scatter shield Floor column base Floor scatter shield...
Страница 64: ...60...