![Schweitzer Engineering Laboratories SEL-311B Скачать руководство пользователя страница 71](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-311b/sel-311b_instruction-manual_1216695071.webp)
Date Code 20011205
Distance, Overcurrent, Voltage,
3-27
and Synchronism Check Elements
SEL-311B Instruction Manual
51PR = 1 (logical 1), if I
ABC
£
pickup setting 51PP and the phase time-overcurrent element
is fully reset
= 0 (logical 0), if I
ABC
£
pickup setting 51PP and the phase time-overcurrent element
is timing to reset (not yet fully reset)
= 0 (logical 0), if I
ABC
> pickup setting 51PP and the phase time-overcurrent element
is timing or is timed out on its curve
Torque Control Switch Open
If the Torque Control Switch in Figure 3.18 is open, maximum phase current, I
ABC
, cannot get
through to the pickup comparator (setting 51PP) and the curve timing/reset timing functions. For
example, suppose that the Torque Control Switch is closed, I
ABC
is:
I
ABC
> pickup setting 51PP
and the phase time-overcurrent element is timing or is timed out on its curve. If the Torque
Control Switch is then opened, I
ABC
effectively appears as a magnitude of zero (0) to the pickup
comparator:
I
ABC
= 0 A (effective)
<
pickup setting 51PP
resulting in Relay Word bit 51P deasserting to logical 0. I
ABC
also effectively appears as a
magnitude of zero (0) to the curve timing/reset timing functions, resulting in Relay Word bit
51PT also deasserting to logical 0. The phase time-overcurrent element then starts to time to
reset. Relay Word bit 51PR asserts to logical 1 when the phase time-overcurrent element is fully
reset.
Torque Control
Refer to Figure 3.18.
SEL
OGIC
control equation torque control settings (e.g., 51PTC) cannot be set directly to logical 0.
The following are settings examples of SEL
OGIC
control equation torque control setting 51PTC
for phase time-overcurrent element 51PT.
51PTC = 1
Setting 51PTC set directly to logical 1:
The Torque Control Switch closes and phase time-overcurrent element
51PT is enabled and nondirectional.
Note
: All overcurrent element SEL
OGIC
control equation torque control settings
are set directly to logical 1 (e.g., 51PTC = 1) for the factory default
settings. See
SHO Command (Show/View Settings)
in
Section 10: Serial
Port Communications and Commands
for a list of the factory default
settings.
51PTC = IN105 Input IN105 deasserted (51PTC = IN105 = logical 0):
The Torque Control Switch opens and phase time-overcurrent element
51PT is defeated and nonoperational, regardless of any other setting.
Содержание SEL-311B
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 24: ......
Страница 26: ......
Страница 122: ......
Страница 124: ......
Страница 138: ......
Страница 168: ......
Страница 172: ......
Страница 254: ......
Страница 282: ......
Страница 306: ......
Страница 348: ......
Страница 364: ......
Страница 366: ......
Страница 448: ......
Страница 460: ......
Страница 466: ......
Страница 476: ......
Страница 482: ......
Страница 494: ......
Страница 500: ......
Страница 522: ......
Страница 526: ......
Страница 528: ......
Страница 534: ......
Страница 536: ......
Страница 550: ......
Страница 570: ......
Страница 586: ......
Страница 600: ......