![Schweitzer Engineering Laboratories SEL-311B Скачать руководство пользователя страница 224](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-311b/sel-311b_instruction-manual_1216695224.webp)
8-2
Breaker Monitor and Metering Functions
Date Code 20011205
SEL-311B Instruction Manual
Table 8.1: Breaker Maintenance Information
for an Example Circuit Breaker
Current
Interruption
Level (kA)
Permissible Number
of Close/Open
Operations*
0.00–1.20
10,000
2.00 3,700
3.00 1,500
5.00
400
8.00
150
10.00
85
20.00
12
* The action of a circuit breaker closing and then later opening is counted as one
close/open operation.
The breaker maintenance information in Table 8.1 is plotted in Figure 8.1.
Connect the plotted points in Figure 8.1 for a breaker maintenance curve. To estimate this
breaker maintenance curve in the SEL-311B Relay breaker monitor, three set points are entered:
Set Point 1
maximum number of close/open operations with corresponding current
interruption level.
Set Point 2
number of close/open operations that correspond to some midpoint
current interruption level.
Set Point 3
number of close/open operations that correspond to the maximum
current interruption level.
These three points are entered with the settings in Table 8.2.
Содержание SEL-311B
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 24: ......
Страница 26: ......
Страница 122: ......
Страница 124: ......
Страница 138: ......
Страница 168: ......
Страница 172: ......
Страница 254: ......
Страница 282: ......
Страница 306: ......
Страница 348: ......
Страница 364: ......
Страница 366: ......
Страница 448: ......
Страница 460: ......
Страница 466: ......
Страница 476: ......
Страница 482: ......
Страница 494: ......
Страница 500: ......
Страница 522: ......
Страница 526: ......
Страница 528: ......
Страница 534: ......
Страница 536: ......
Страница 550: ......
Страница 570: ......
Страница 586: ......
Страница 600: ......