background image

10. If all nozzles don’t work identically, press the water button on the touch screen display (picture 5) and hold it until the water starts
flowing from the nozzles and next repeat the procedure given in points 7-9. The procedure given in points 7-9 must also be repeated if the
precoating container has been empty, so the pump must fill in the ducts again.

3

  .    Working with the machine          

 

 

3.1   Usage of the machine

PRETREAT   maker   LINE   is   self-   contained   industrial   pretreatment   device   for   the   full   process   of   preparing   garments   including
preatreatment, drying and pre-pressing. It is destined for automatic application of precoat for white ink in printers directly printing on fabrics.
The device is equipped with 5 nozzles. Application of the precoat is executed directly over the fabric. The containers may not be filled with
other liquids.

3.2   Starting the working procedure

T-shirt     has   to   be   placed   on   the   base   plate,   which   is   situated   in   the   operators’   area  

(picture   1A)

.   After   pushing   the   START  

button the movement of the plates will start 

(picture 1B).

 The plate with the t-shirt moves to the pretreatment station. While it gets covered

automatically with the precoating, the operator is placing another t-shirt on the base plate that arrives to his work station. After pushing the
start button again the first plate with t-shirt moves automatically to the drying tunnel. Every time after pushing the START button the plates
will will move by one station to the right. Depending on model, there are 6 or 4 stations in the drying tunnel. After the drying process, the
first base plate with the t-shirt arrives to the heat press station and gets pressed. After pushing the START button again the first base plate
with the t-shirt arrives to the operators’ station and the process is finished. The t-shirt is covered with the precoating, dried and pressed.
There can be 11 t-shirts in a machine at a time in 11-6 Version or 7 t-shirts in 7-4 Version.

3.3   Programming and functions of the machine

1.

Setting the temperature of the air flow

After   touching   the   field,   the   keyboard   will   appear   on   the   display.   Max.   temperature   of   the   air   flow   is   250ºC.   Recommended
temperature is 185ºC. 

2.

Current power consumption of the air flow

Power consumption level, expressed as percentage. While warming up the drying tunnel, the power consumption reaches 100%.
After the programmed temperature is reached, the power consumption is reduced till around 70%. Power consumption level depends
on the external conditions and on the number of t-shirts that are currently in the drying tunnel.

3.

Current temperature of the air flow

Current temperature of the hot air is shown on the display.

                                                                   

Version 18.04

8/20

Содержание PRETREATmaker LINE 11-6

Страница 1: ...Instruction manual Version 18 04 Self contained industrial pretreatment device for the full process of preparing garments incluiding pretreatment drying and pre pressing 7 4 11 6 Version 18 04 1 20...

Страница 2: ...08 3 3 Programming and functions of the machine 08 3 4 Changing the precoating liquid during operation 11 3 5 Barcode printing 11 3 6 Configuration of the barcode scanner 11 4 Maintenance 12 4 1 Dail...

Страница 3: ...1 2 Construction of the machine Version 18 04 3 20...

Страница 4: ...in fuse prevents the machine from getting damaged If the main fuse has been switched off it has to be switched on again Fuse 6A Pretreatment station The fuse 6A is located in the back part of the pret...

Страница 5: ...about the safety functions and the range of application about the machine to the user In particular the user needs to be acquainted with the complete manual personally and be explicitly informed abou...

Страница 6: ...filters are excluded from the warranty Thermo fuses temperature sensors switches and buttons and all springs in the machines have a warranty of 6 months 2 3 Supply voltage The PRETREATmaker LINE has t...

Страница 7: ...the machine on check whether the protective cable is correctly connected All containers should be controlled before starting operations The container with precoating liquid should be shaken everyday...

Страница 8: ...es to his work station After pushing the start button again the first plate with t shirt moves automatically to the drying tunnel Every time after pushing the START button the plates will will move by...

Страница 9: ...it on 8 seconds 14 Current temperature of the heat press The current temperature of the heat plate is shown on the display 15 Current power consumption of the heat press Power consumption level expres...

Страница 10: ...will move by one position to the left 39 Movement right After touching the icon the base plates will move by one position to the right 40 Current status of the machine Depending on the status of the m...

Страница 11: ...E 39 Work parameters can also be generated with another system and transferred to the machine Job parameter setup needs to follow these rules read from left to right The first 2 numbers represent the...

Страница 12: ...ls and protects the rails against precoating liquid 1 Don t let the liquid flow over the waste water container The container should be emptied if the need arises 2 The containers with pre coating liqu...

Страница 13: ...elt zdj cie 3 put the covering rail back and screw the fixing screw on It is recommended to grease the main driver once a month using a brush and a waterproof grease for example CX 80 picture 4 It is...

Страница 14: ...ake out the panels with silicone covers pictures 15 16 and clean them picture 17 Clean the upper covers in the same way picture 18 It is recommended to clean the Fan s filter every 6 months Unscrew th...

Страница 15: ...r to do this the fastening screw has to be loosen picture 5 Move the sensor down to the middle of the cylinder length and then move it up till the diode will glow Then move the sensor for another 5 mm...

Страница 16: ...ase the machine is not working after it has been switched on check the safety fuse The safety fuse 6A is located in the back side of the pretreatment station In order to replace it turn off the machin...

Страница 17: ...er in the pretreatment station is moved or damaged Check if the diode on the sensor which is situated in the upper part of the pneumatic cylinder glows when the side cover of the pretreatment station...

Страница 18: ...4 10 Wiring diagram Version 18 04 18 20...

Страница 19: ...Version 18 04 19 20...

Страница 20: ...Schulze GmbH Haberstra e 15 19 12057 Berlin as European representative of the manufacturer company ROMANIK hereby declares that the following machine Type Name Serial number is compliant with the spec...