4.5   Instructions for replacement, cleaning and storage of the nozzles

      

    

Replacement:

1. Open the front cover 

(picture 1).

2. Turn the nozzle left and then pull it out down 

(picture 2)

3. Place a new nozzle and fix it in the machine.

Cleaning:

1. The nozzle may be cleaned in an ultrasonic cleaner 

(picture 3).

2. To clean the nozzles please use destilled water or jewerlly cleaner.
3. Fill the cleaner with some water.
4. Put the nozzles into the cleaner
5. Turn it on for 7 minutes (max. 15 minutes).
6. After that please take them out to dry.

Storage:

To storage the nozzles please use clean distilled water. Never leave the nozzles exposed to air when there are remains of precoating on
the nozzles. Store the nozzles in clean, distilled water and clean them at least once a week.

4.6    Instructions for replacement of the fuse in the pretreatment station

In case the machine is not working after it has been switched on, check the safety fuse. The safety fuse (6A) is located in the back side of
the pretreatment station. In order to replace it, turn off the machine and pull out the power plug. Now open the holder with the fuses

(picture 1).

 There are 2 fuses: fuse A and fuse B. Fuse A is connected to the machine – fuse B is a spare fuse. Remove both fuses from

the holder 

(picture 3).

 Now insert fuse B in a place of the fuse A and close the fuse holder.

4.7   Activation of the main fuse

If the machine is not working after it has been switched on check the main fuse 
of the machine. The main fuse is situated in the control box. Open the cover

of the control box and if needed switch the main fuse on (picture).

4.8   Instructions for replacement of the filter

If the precoating dosage is not smoothly carried out check the filter and if necessary – replace it. Open the side cover. The filters are in
the containers with precoating. Remove the tube from the container and replace the filter.

                                                                   

Version 18.04

16/20

Содержание PRETREATmaker LINE 11-6

Страница 1: ...Instruction manual Version 18 04 Self contained industrial pretreatment device for the full process of preparing garments incluiding pretreatment drying and pre pressing 7 4 11 6 Version 18 04 1 20...

Страница 2: ...08 3 3 Programming and functions of the machine 08 3 4 Changing the precoating liquid during operation 11 3 5 Barcode printing 11 3 6 Configuration of the barcode scanner 11 4 Maintenance 12 4 1 Dail...

Страница 3: ...1 2 Construction of the machine Version 18 04 3 20...

Страница 4: ...in fuse prevents the machine from getting damaged If the main fuse has been switched off it has to be switched on again Fuse 6A Pretreatment station The fuse 6A is located in the back part of the pret...

Страница 5: ...about the safety functions and the range of application about the machine to the user In particular the user needs to be acquainted with the complete manual personally and be explicitly informed abou...

Страница 6: ...filters are excluded from the warranty Thermo fuses temperature sensors switches and buttons and all springs in the machines have a warranty of 6 months 2 3 Supply voltage The PRETREATmaker LINE has t...

Страница 7: ...the machine on check whether the protective cable is correctly connected All containers should be controlled before starting operations The container with precoating liquid should be shaken everyday...

Страница 8: ...es to his work station After pushing the start button again the first plate with t shirt moves automatically to the drying tunnel Every time after pushing the START button the plates will will move by...

Страница 9: ...it on 8 seconds 14 Current temperature of the heat press The current temperature of the heat plate is shown on the display 15 Current power consumption of the heat press Power consumption level expres...

Страница 10: ...will move by one position to the left 39 Movement right After touching the icon the base plates will move by one position to the right 40 Current status of the machine Depending on the status of the m...

Страница 11: ...E 39 Work parameters can also be generated with another system and transferred to the machine Job parameter setup needs to follow these rules read from left to right The first 2 numbers represent the...

Страница 12: ...ls and protects the rails against precoating liquid 1 Don t let the liquid flow over the waste water container The container should be emptied if the need arises 2 The containers with pre coating liqu...

Страница 13: ...elt zdj cie 3 put the covering rail back and screw the fixing screw on It is recommended to grease the main driver once a month using a brush and a waterproof grease for example CX 80 picture 4 It is...

Страница 14: ...ake out the panels with silicone covers pictures 15 16 and clean them picture 17 Clean the upper covers in the same way picture 18 It is recommended to clean the Fan s filter every 6 months Unscrew th...

Страница 15: ...r to do this the fastening screw has to be loosen picture 5 Move the sensor down to the middle of the cylinder length and then move it up till the diode will glow Then move the sensor for another 5 mm...

Страница 16: ...ase the machine is not working after it has been switched on check the safety fuse The safety fuse 6A is located in the back side of the pretreatment station In order to replace it turn off the machin...

Страница 17: ...er in the pretreatment station is moved or damaged Check if the diode on the sensor which is situated in the upper part of the pneumatic cylinder glows when the side cover of the pretreatment station...

Страница 18: ...4 10 Wiring diagram Version 18 04 18 20...

Страница 19: ...Version 18 04 19 20...

Страница 20: ...Schulze GmbH Haberstra e 15 19 12057 Berlin as European representative of the manufacturer company ROMANIK hereby declares that the following machine Type Name Serial number is compliant with the spec...

Отзывы: