background image

1.     

 

 

Introduction

 

 

1.1 Content

      

    

1.   Introduction                                                                     

02

                                                                                                    
1.1   Content

02                                                        

1.2   Construction of the machine

03

1.3   Technical data

04                                                        

1.4   Protection of the device

04                                     

1.5   Safety arrangements at the workplace

05

2.   Initiation

06

2.1    Notes regarding transportation

06

2.2    Warranty terms and conditions

06

2.3    Supply voltage

06

2.4    Connecting the machine to the compressor

06

2.5    Preparation of the machine for operation

07

3.   Working with the machine

08

3.1    Usage of the machine

08

3.2    Starting the working procedure

08

3.3    Programming and functions of  the machine

08

3.4    Changing the precoating liquid during operation

11

3.5    Barcode printing

11

3.6    Configuration of the barcode scanner

11

4.   Maintenance

12

4.1    Daily maintenance

12

4.2    Periodic maintenance

13

4.3    Side cover’s sensors adjustment (pretreatment station)

15

4.4    Electronic RE 72 settings

15

4.5    Instructions for replacement, cleaning and storage of the nozzles

16

4.6    Instructions for replacement of the fuse in the pretreatment station

16

4.7    Activation of the main fuse

16

4.8    Instructions for replacement of the filter

16

4.9    Troubleshooting

17

4.10  Wiring diagram

18

4.11  Testing report

20

4.12  EC – Conformance declaration

20 

   

    
                                                 
                                                                   

                                                                   

Version 18.04

2/20

Содержание PRETREATmaker LINE 11-6

Страница 1: ...Instruction manual Version 18 04 Self contained industrial pretreatment device for the full process of preparing garments incluiding pretreatment drying and pre pressing 7 4 11 6 Version 18 04 1 20...

Страница 2: ...08 3 3 Programming and functions of the machine 08 3 4 Changing the precoating liquid during operation 11 3 5 Barcode printing 11 3 6 Configuration of the barcode scanner 11 4 Maintenance 12 4 1 Dail...

Страница 3: ...1 2 Construction of the machine Version 18 04 3 20...

Страница 4: ...in fuse prevents the machine from getting damaged If the main fuse has been switched off it has to be switched on again Fuse 6A Pretreatment station The fuse 6A is located in the back part of the pret...

Страница 5: ...about the safety functions and the range of application about the machine to the user In particular the user needs to be acquainted with the complete manual personally and be explicitly informed abou...

Страница 6: ...filters are excluded from the warranty Thermo fuses temperature sensors switches and buttons and all springs in the machines have a warranty of 6 months 2 3 Supply voltage The PRETREATmaker LINE has t...

Страница 7: ...the machine on check whether the protective cable is correctly connected All containers should be controlled before starting operations The container with precoating liquid should be shaken everyday...

Страница 8: ...es to his work station After pushing the start button again the first plate with t shirt moves automatically to the drying tunnel Every time after pushing the START button the plates will will move by...

Страница 9: ...it on 8 seconds 14 Current temperature of the heat press The current temperature of the heat plate is shown on the display 15 Current power consumption of the heat press Power consumption level expres...

Страница 10: ...will move by one position to the left 39 Movement right After touching the icon the base plates will move by one position to the right 40 Current status of the machine Depending on the status of the m...

Страница 11: ...E 39 Work parameters can also be generated with another system and transferred to the machine Job parameter setup needs to follow these rules read from left to right The first 2 numbers represent the...

Страница 12: ...ls and protects the rails against precoating liquid 1 Don t let the liquid flow over the waste water container The container should be emptied if the need arises 2 The containers with pre coating liqu...

Страница 13: ...elt zdj cie 3 put the covering rail back and screw the fixing screw on It is recommended to grease the main driver once a month using a brush and a waterproof grease for example CX 80 picture 4 It is...

Страница 14: ...ake out the panels with silicone covers pictures 15 16 and clean them picture 17 Clean the upper covers in the same way picture 18 It is recommended to clean the Fan s filter every 6 months Unscrew th...

Страница 15: ...r to do this the fastening screw has to be loosen picture 5 Move the sensor down to the middle of the cylinder length and then move it up till the diode will glow Then move the sensor for another 5 mm...

Страница 16: ...ase the machine is not working after it has been switched on check the safety fuse The safety fuse 6A is located in the back side of the pretreatment station In order to replace it turn off the machin...

Страница 17: ...er in the pretreatment station is moved or damaged Check if the diode on the sensor which is situated in the upper part of the pneumatic cylinder glows when the side cover of the pretreatment station...

Страница 18: ...4 10 Wiring diagram Version 18 04 18 20...

Страница 19: ...Version 18 04 19 20...

Страница 20: ...Schulze GmbH Haberstra e 15 19 12057 Berlin as European representative of the manufacturer company ROMANIK hereby declares that the following machine Type Name Serial number is compliant with the spec...

Отзывы: