- 7 -
CO
2
span calibration
(Ex
䠅
When setting CO
2
density is 5.0% and actual CO
2
density is 4.5%:
Process Operation MENU
1
Put densitometer thorough the sample port at the front side of the unit to measure
chamber CO
2
density.
2
Select Tools in the Top Screen.
Tools
3
Select Tools (1/2) is displayed. Select temp / CO
2
Calibration and press OK key.
OK
4
By pressing digit shift key and numerical value shift key, input actual CO
2
density
䠄
4.5%
䠅
in the column CO
2
Span. Select OK and press ENTER key.
OK
5
Automatically reverts to Select Tools (1/2) screen.
*Note
㻌
(1) Input range: +1.0% ~ -1.0% (per input).
(2) Repeat CO2 calibration for several times until displayed CO2 density will match with
actual density.
(3) It is permitted to commence CO2 span calibration only when setting CO2 density is 5.0
䠂
.
CO
2
span calibration
䠘
Display of Process-2
䠚
䠘
Display of Process-3
䠚
Содержание MCO-19M
Страница 7: ... 4 Dimensions Power cord ...
Страница 16: ...Wiring diagram 13 ...
Страница 17: ...Circuit diagram Main PCB 14 ...
Страница 18: ... LCD PCB 15 ...
Страница 110: ...MCO 19M UVH MCO 19M UV MCO 19M Multi Gas Incubator INSTRUCTION MANUAL 107 ...
Страница 112: ...CONTENTS SPECIFICATIONS P 74 PERFORMANCE P 75 SAFETY CHECK SHEET P 76 109 2 ...
Страница 183: ...Fig A Stacking plate B Stacking plate A Protective sticker Front panel Hook Front 180 73 ...
Страница 187: ...SANYO Electric Co Ltd Printed in Japan DC3186 150B ...