Commissioning
Proper operation requires the following:
‒ The appliance must be correctly connected by the authorised Customer Service (page 71 , sec
‒ The built-in water softener must be configured to the existing water hardness (page 65 , sec
‒ The user interface – including screen brightness, warning beeps, date, language, start screen,
home screen, HACCP, cooking data – must be adjusted for the operator (from page 45 , sec
tion 9.).
.
Clean the appliance inside and outside before commissioning.
● For cleaning instructions, see page 62 , section 11.
Commissioning
After being switched on for the first time, the steam generator and water softener are filled with water
automatically (duration approx. 2 min). The steam generator heating-up process then starts. (Total
duration approx. 8 min.)
Please note: The safety temperature limiter cuts off at temperatures below zero. The safety tempera
ture limiter switches on again automatically once it is warm enough again. The appliance cannot be
used until the limiter has switched on.
4.1
Preparing the appliance for use
.
Check to ensure that the cooking chamber is clean and free of cleaning agent residues.
.
Open the water tap.
.
Switch on the mains switch upstream of the appliance.
Suspension
bolts for remo
vable rack
Drip tray
Seal
Drain screen
Right removable rack
Fitting the parts
.
Fit the seal to the cooking chamber door.
.
Fit the drain screen to the cooking chamber
drain.
.
Hook the drip tray into place.
.
Hook in the left and right removable racks.