Clear the area in front of the airlock feeder outlet
20
for testing.
11.
Cycle the toggle switch in the remote cord housing toward the cord
and the blower only will come on, check that rotation is the same as
the arrow Indicates on the blower
10
. With the blower operating
satisfactorily, cycle the switch toward the end of the housing and the
blower and machine mechanisms will operate simultaneously. Check
that rotation is the same as the arrow indicates on the gearboxes
11
.
The tachometer
21
on the machine front panel should read
1050 rpm
.
The tachometer also has an hour meter that records machine mechanism
time; airlock feeder, shredder, and hopper components.
12.
If all rotations are correct, shut the machine down and engage the
transmission into gear. Start the machine and cycle the remote toggle
switch toward the end of the housing and check that the airlock feeder,
shredder, and hopper components are rotating. For any rotation
problems, check the troubleshooting section or call CTMW.
Warning: Whenever the vacuum is needed, always turn on the toggle
switch 22 before the PTO is engaged. This will prevent premature wear on
the clutch armature. The vacuum can be turned off at any time but, if it is
turned off before the job is complete, disengage the PTO before you turn
the vacuum back on.
13.
Bring the truck down to a low idle and disengage the PTO. Flip the toggle
switch
22
to the on position for power to the vacuum clutch. Engage the
PTO and bring the truck idle up to the proper rpm and notice that the
vacuum speeds up.
Always
switch the vacuum on and then engage the PTO.
This procedure will prevent premature wear on the clutch providing long life.
14.
Turn on the light plugged into the generator to check that power is supplied.
15.
With everything operating satisfactorily, take some time to get to know
your
Volu-Matic 500
machine. Engage and disengage the remote cord
noticing the drives start and stop. With the chain drives on, open and close
the front swing gate guards noticing the drives stop and start.
16.
Upon completion of the initial start-up procedures; turn the remote cord
toggle switch off and unplug from the receptacle, turn off the master switch,
turn off any power connected to the generator, idle the truck to a low rpm,
turn off the vacuum by depressing the switch to the off position, and then
disengage the PTO. The
Volu-Matic 500
machine is now ready for service.
17.
For any problems encountered during machine start-up,
check the troubleshooting section or call CTMW.
20
10
11
21
22
Содержание CertainTeed Volu-Matic 500
Страница 6: ...6 Introduction...
Страница 24: ...24 Preventive Maintenance...
Страница 38: ...38 Troubleshooting...
Страница 42: ...42 Parts Drawings...
Страница 57: ...57...
Страница 61: ...61 Preventive Maintenance Record DATE JOB DESCRIPTION PERFORMED BY...