  Clear the area in front of the airlock feeder outlet  

20

  for testing.

 11.

  Cycle the toggle switch in the remote cord housing toward the cord  

and the blower only will come on, check that rotation is the same as  
the arrow Indicates on the blower  

10

. With the blower operating  

satisfactorily, cycle the switch toward the end of the housing and the  
blower and machine mechanisms will operate simultaneously. Check  
that rotation is the same as the arrow indicates on the gearboxes  

11

 .  

The tachometer  

21

  on the machine front panel should read 

1050 rpm

.  

The tachometer also has an hour meter that records machine mechanism  
time; airlock feeder, shredder, and hopper components.

 12.

  If all rotations are correct, shut the machine down and engage the  

transmission into gear. Start the machine and cycle the remote toggle  
switch toward the end of the housing and check that the airlock feeder,  
shredder, and hopper components are rotating. For any rotation  
problems, check the troubleshooting section or call CTMW.

Warning: Whenever the vacuum is needed, always turn on the toggle  
switch  22  before the PTO is engaged. This will prevent premature wear on  
the clutch armature. The vacuum can be turned off at any time but, if it is  
turned off before the job is complete, disengage the PTO before you turn  
the vacuum back on.

 13.

  Bring the truck down to a low idle and disengage the PTO. Flip the toggle  

switch  

22

  to the on position for power to the vacuum clutch. Engage the  

PTO and bring the truck idle up to the proper rpm and notice that the  
vacuum speeds up. 

Always

 switch the vacuum on and then engage the PTO.  

This procedure will prevent premature wear on the clutch providing long life.

 14.

 Turn on the light plugged into the generator to check that power is supplied.

 15.

  With everything operating satisfactorily, take some time to get to know  

your 

Volu-Matic 500

 machine. Engage and disengage the remote cord  

noticing the drives start and stop. With the chain drives on, open and close  
the front swing gate guards noticing the drives stop and start.

 16.

  Upon completion of the initial start-up procedures; turn the remote cord  

toggle switch off and unplug from the receptacle, turn off the master switch,  
turn off any power connected to the generator, idle the truck to a low rpm,  
turn off the vacuum by depressing the switch to the off position, and then  
disengage the PTO. The 

Volu-Matic 500

 machine is now ready for service.

 17.

  For any problems encountered during machine start-up,  

check the troubleshooting section or call CTMW.

20

10

11

21

22

Содержание CertainTeed Volu-Matic 500

Страница 1: ...Safety Information Volu Matic 500 Parts Service Accessories 863 294 3206 800 237 7841 www certainteedmachineworks com PLEASE READ THIS MANUAL BEFORE PLACING YOUR NEW VOLU MATIC 500 INSULATION BLOWING...

Страница 2: ...ot guarantee performance of the Volu Matic 500 machine if hoses are undersized worn damaged or hoses other than those we recommend are used NOTE Keep in mind that a weak truck battery may not be power...

Страница 3: ...SPECIFICATIONS 4 ACCESSORY AND INSTALLATION KITS 5 INTRODUCTION 6 SAFETY 8 OPERATION 12 PREVENTIVE MAINTENANCE 24 TROUBLESHOOTING 38 PARTS DRAWINGS 42 PREVENTIVE MAINTENANCE RECORD 63 Table of Content...

Страница 4: ...n water pump built in generator HEIGHT 74 LOAD HEIGHT 60 LENGTH 88 5 WIDTH 80 WEIGHT 2500 lbs ELECTRICAL 12V remote control 120V accessory power BLOWER VOLUME 270 cfm 2 psi BLOWER PRESSURE 6 0 psi max...

Страница 5: ...wer Intake Truck Flange 4 5 P N 209072 1 EA 4 1 2 Worm Drive Hose Clamp P N 162486 2 EA 4 1 2 CWC Spiral Hose P N 162380 3 FT V M V PTO Tubular Drive Shaft P N 210486 1 EA V5 Vacuum Idler Spacer Washe...

Страница 6: ...6 Introduction...

Страница 7: ...accepting another material conditioner known as the stator bar Study the operation section under coverage concerning use of the stator bar Air volume can be controlled independently which also optimi...

Страница 8: ...rning displayed in a prominent place Do not remove modify or deface the warning label WARNING if any foreign object should enter the machine push an emergency stop button in off turn off the master sw...

Страница 9: ...t remove modify or deface the warning labels The purpose of this sign is to make the operator aware that they may lose balance and fall This warning sign is displayed on the truck after installation o...

Страница 10: ...r be opened while your Volu Matic 500 machine is in operation there are shafts with guarding over them which are still rotating If these gates are opened safety switches 2 are mounted to the swing gat...

Страница 11: ...achine after the emergency stop buttons are pulled back out on for machine operation If any safety switch interlock should become damaged replace it keep your Volu Matic 500 machine safe During machin...

Страница 12: ...ne Works is supplied with thin wall couplers and clamps The airlock feeder outlet 20 is 4 inches in diameter A thin wall 4 to 3 1 2 reducer is supplied with new delivered machines for open blow operat...

Страница 13: ...2 When checking the oil in the blower turn the brass valve 13 90 degrees to check a small amount should appear indicating sufficient oil Refer to the maintenance section for capacities and type of oil...

Страница 14: ...the belt drive from under the truck is tracking true on the idlers and that no excessive belt slap is occurring Shut the truck down for any belt tensioning adjustment Once the belts are tensioned prop...

Страница 15: ...vacuum can be turned off at any time but if it is turned off before the job is complete disengage the PTO before you turn the vacuum back on 13 Bring the truck down to a low idle and disengage the PT...

Страница 16: ...upplied with NEW delivered machines to hold in place SIDEWALL During sidewall spray operation you will need to mount the 4 inch hose to the vacuum inlet The vacuum housing transition exit 17 will be c...

Страница 17: ...th as specified in the table LOADING The operator loads the machine hopper from a standing position on the floor depositing bags of material on the drop gate 26 Pull the drop gate sharply toward you t...

Страница 18: ...pm for open blow operation Reduce machine speed until tachometer reading is 800 850 for all sidewall operations but spraying reducing speed for spraying sidewalls will result in loss of vacuum pressur...

Страница 19: ...c 500 machine is in operation Always change gears when the machine is completely shut down Failure to do so can result in serious personal injuries or a severely damaged AIR VOLUME CONTROL SYSTEM Refe...

Страница 20: ...ch assembly Additionally the vacuum switch is wired through the master switch so that the vacuum switch would not be left on accidentally This could drain the truck battery down overnight causing the...

Страница 21: ...he internal coils of the blower and mechanism relays This causes the normally open contacts in both relays to close sending power to the respective clutches simultaneously At any time that an emergenc...

Страница 22: ...n feed rates are too low and material is overworked by the machine mechanisms or the wrong hose is used rolling the fibers into tight little balls Coverage will also decrease if feed rates are too hig...

Страница 23: ...starting point and the distance varied as required Densities will vary as the job progresses from dry material to dry and wet material affecting nozzle velocity Introducing vacuumed material into the...

Страница 24: ...24 Preventive Maintenance...

Страница 25: ...Check and clean the blower air inlet truck flange 37 and as required during operation Keep these screens clean 4 Visually inspect and remove any foreign objects that may have entered the machine such...

Страница 26: ...rated grease gun 12 Check blower relief valve 43 function 13 Check chain and belt tension adjust as required AIRLOCK FEEDER The airlock feeder will require periodic maintenance to prolong the life of...

Страница 27: ...u Matic 500 machine Excessively worn parts are considered to be when 25 of metal thickness has worn away see replace the feeder end plates Supplies and tools for seal change set of seals P N 210903 ST...

Страница 28: ...bearing it may be necessary to use a dead blow soft hammer to fit rotor all the way in the feeder while rotating Push rotor as far in as possible with seals beginning to bend over on the side against...

Страница 29: ...d Plates section Supplies and tools for seal change set of seals P N 210009 Quick Change Feeder spare 3 8 16 x 1 length grade eight bolts thread Loctite spray silicon ratchet and 8 extension 9 16 sock...

Страница 30: ...he rotor add Loctite to the threads of the attach bolts G Insert attach bolts with lock washers in end holes and tighten 9 Remove alignment pin and insert remaining bolts apply thread Loctite and use...

Страница 31: ...ndication that the rubber feeder seals are not being changed on schedule were damaged during operation or an abrasive material requires that the seals be changed sooner Refer to the drawing and follow...

Страница 32: ...EDER ASSEMBLY COMPLETE 1 Remove the feeder chain drive components including the chain idler assembly 2 Remove bolts that attach the feeder to the shredder housing and machine frame slide spacers out f...

Страница 33: ...33 3 Disconnect the air stream connection hose 4 Remove the drive belts to the shredder hammer shaft and remove the shredder belt idler assembly...

Страница 34: ...to clear hammers when pulling from machine frame connection hose The following label is displayed on the feeder of new delivered machines as a reminder to change seals the hour meter in the tachometer...

Страница 35: ...ings 41 should be greased once a week or every 30 hours of operation Do not over lubricate one to two pumps from a hand operated grease gun is sufficient CTMW uses lithium based high temperature greas...

Страница 36: ...t difference over 1 0 psi should be reported to the factory Never attempt to readjust the spring loaded relief valve without consulting the factory CAUTION Do not grease or oil since the relief valve...

Страница 37: ...il level weekly in the blower Follow manufacturer s recommended maintenance schedule as specified in the blower s manual CTMW fills Tuthill blowers with SAE30 and all other makes with 15W 40 motor oil...

Страница 38: ...38 Troubleshooting...

Страница 39: ...tion may also be caused by loose or corroded battery connections 1 PTO will not engage a See truck manufacturer s PTO accessory manual 2 The input clutch shaft and rear gearbox are turning but there a...

Страница 40: ...relief valve is not stuck open c Check if blower air intake truck flange is clogged d Check airstream and bleed air hose connections e Check that one way air check valve is not stuck open The check v...

Страница 41: ...vacuum clutch is operating c Clutch not operational check wire harness and clutch electrical connections d Check truck battery clutch will not cycle or will slip if battery is not fully charged Check...

Страница 42: ...42 Parts Drawings...

Страница 43: ...CONTROL VOLU MATIC 300 500 DO NOT SCALE DRAWING SLIDE GATE SHEET 1 OF 1 4 11 2022 AGA UNLESS OTHERWISE SPECIFIED SCALE 1 24 REV DWG NO A SIZE TITLE NAME DATE CHECKED DRAWN BY FINISH MATERIAL DIMENSIO...

Страница 44: ...FFERENCES THAT WILL REQUIRE AN ADDITIONAL FELT WASHER 209998 Brg Felt Seal 1 8 X3 0 162010 Bearing 2 Hole Counter Sunk 1 1 4 Bore 3 8 16 x 1 Bolt 209859 4 Outlet End Plate L BRG 7 16 Flat Washer 7 16...

Страница 45: ...NGLE 1 TWO PLACE DECIMAL 03 THREE PLACE DECIMAL 01 PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF CERTAINTEED MACHINE WORKS ANY REPRODUCTION IN PART OR...

Страница 46: ...Flat Washer 162010 Bearing 2 Hole Counter Sunk 1 1 4 Bore 7 16 14 Nylock Nut 162010 Bearing 2 Hole Counter Sunk 1 1 4 Bore 209998 Brg Felt Seal 1 8 x 3 0 210009 Quick Change Seal Set of 6 DETAIL A 21...

Страница 47: ...re 3 8 Flat Washer 3 8 16 x 1 25 Hex Head 10 32 x 0 5 Pan Head Screw 10 Start Washer 3 8 16 Nylock Nutt 210781 Plexiglass Cvr W Felt Tape 210036 Front Shredder Panel DETAIL A SCALE 1 2 10 Start Washer...

Страница 48: ...Sealtight Connect 209070 Wire Harness Tab 161665 Box Cover Detail A Scale 1 4 5 162531 3 8 Romex Connector 161692 Magnetic Tach Pickup VACUUM COMPONENTS 210980 V5 VAC Wire With Switch 159801 SPST Tog...

Страница 49: ...Exp Pillow Block 1 7 16 157623 Bearing Exp Pillow Block 1 7 16 210092 QTY 2 1 2 Universal Take Up Angle 210152 1 7 16 PTO Clutch Shaft 209897 V3 Rubber Torque Arm Kit Ship 209897 V3 Rubber Torque Arm...

Страница 50: ...09 Bearing 2 Hole Counter Sunk 1 3 16 Bore 3 8 16 x 6 Hex Head Bolt 160480 4032 1 3 16 Bore 1 4 KW Sprocket 210546 Stub Shaft Reversing Idler 160631 4017 Chain Roller 40 10Ft Box 160631 4017 Chain Rol...

Страница 51: ...SCALE DRAWING 35A06027 SHEET 1 OF 1 4 11 2022 AGA UNLESS OTHERWISE SPECIFIED SCALE 1 8 REV DWG NO A SIZE TITLE NAME DATE CHECKED DRAWN BY FINISH MATERIAL DIMENSIONS ARE IN INCHES TOLERANCES FRACTIONAL...

Страница 52: ...DRAWING PTO IDLER ASSY SHEET 1 OF 1 4 11 2022 J R AGA UNLESS OTHERWISE SPECIFIED SCALE 1 48 REV DWG NO A SIZE TITLE NAME DATE CHECKED DRAWN BY FINISH MATERIAL DIMENSIONS ARE IN INCHES TOLERANCES FRAC...

Страница 53: ...62378 Qty 5ft 2 1 2 CWC Spiral Hose 210930 1 7 8 Marine Exhaust Hose 157515 1 4 90 Degree Pipe Elbow 162419 Gauge 0 10 PSI 162481 2 1 2 Hose Clamp 157851 1 1 2 Street Ell Pipe Fitting 157831 1 1 2 Bra...

Страница 54: ...y 1 4 x 1 3 4 Mild STL 157383 Screw 1 4 20 x 5 8 Hex Head Cap 209061 V M Shear Spk Driving Hub 209900 5060 Bolt Together Shear Assy 161276 5019 1 3 16 Bore Sprocket 209097 8 STUB SHAFTS BOTH CIR L A W...

Страница 55: ...CONTROL VOLU MATIC 300 500 DO NOT SCALE DRAWING SLIDE GATE SHEET 1 OF 1 4 11 2022 AGA UNLESS OTHERWISE SPECIFIED SCALE 1 24 REV DWG NO A SIZE TITLE NAME DATE CHECKED DRAWN BY FINISH MATERIAL DIMENSIO...

Страница 56: ...590 V500 Rear Guard VM500 GUARDS DO NOT SCALE DRAWING 45GUARDS SHEET 1 OF 1 4 11 2022 AGA UNLESS OTHERWISE SPECIFIED SCALE 1 50 REV DWG NO B SIZE TITLE NAME DATE CHECKED DRAWN BY FINISH DIMENSIONS ARE...

Страница 57: ...57...

Страница 58: ...Pipe Nipple 209074 Blower Intake Screen End 161657 1 3 4 Heavy Duty EXH Clamp 157854 1 1 2 X 4 Pipe Nipple VM200 Blower VOLU MATIC 200 AIR STREAM DO NOT SCALE DRAWING VM200 AIR STREAM SHEET 1 OF 1 6 9...

Страница 59: ...OF 1 6 9 2022 AGA UNLESS OTHERWISE SPECIFIED SCALE 1 64 REV DWG NO B SIZE TITLE NAME DATE CHECKED DRAWN BY FINISH DIMENSIONS ARE IN INCHES TOLERANCES FRACTIONAL 1 32 ANGLE 1 TWO PLACE DECIMAL 03 THRE...

Страница 60: ...t not limited to seals feeder shredder auger fuses switches clutches hoses shaft seals chains belts sprockets pulleys bearings cables and batteries The Company s obligation under this warranty is limi...

Страница 61: ...61 Preventive Maintenance Record DATE JOB DESCRIPTION PERFORMED BY...

Страница 62: ...0 03 1931 US EN CertainTeed CE I LI N G S D ECK I N G FE N CE GY P S U M I N S U L ATIO N R AI LI N G ROO FI N G S I D I N G TR I M 101 Hatfield Road Winter Haven Florida 33880 1325 863 294 3206 Sales...

Отзывы: