Section 5 Operating Instructions
F103/4/5A Manual
www.rottlermfg.com
5-10
Diesel Blocks
6725 Diesel Fixture
Small Diesel V Blocks
On these blocks it will be necessary to install the 6370Z, 10” parallels or 6794E, 8” parallels onto the bed
of the machine. These parallels are keyed, place them onto the deck surface and then push them toward
the rear of the machine. This will located them evenly on the middle keyway of the machine bed. Place
the two 6553F main bearing supports onto the parallels, these are also keyed and fit into the machined
slots on the parallels. This will put the two main bearing supports in line with each other. Tighten all bolts
to lock the parallels and main bearing support into place. Select the correct size main bearing locators
and install them into the mains of the block..
Note: Make sure there are no burrs or debris in the main bearing bores where they will contact
the main bearing locators. This can cause the block not to clamp properly and may cause tipping
or rocking of the block.
Handle these large blocks with Extreme care and guidance. A block hoist is
required when handling these blocks. These blocks should be lifted from the
block bank surface.
Install the main bearing locators into the mains of the engine block. Lower the block so that the locators
go into the main bearing support.
The hoist must remain attached to the block until it is firmly clamped into
position. The blocks will have a tendency to tip forward until they are properly
supported and clamp. When not properly supported and attached to a hoist these blocks will roll forward
and out of the fixture. This will cause severe injury or death to operator.
Select the correct jacking screw to reach the block. Place the jacking screws into the jack bodies and
place on the parallels in a location they will support the block from rolling forward.
Position the block clamps so the front of the shoe will clamp the block in the middle on both ends. The
following illustration shows the correct triangle clamping system that should be used.
You can raise and lower the ends of the block by rotating the Hex nut located on the ends of the main
bearing locators.
Содержание F103 Series
Страница 2: ......
Страница 4: ......
Страница 10: ...Section 1 Introduction F103 4 5A Manual www rottlermfg com 1 5...
Страница 21: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 10...
Страница 26: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 15...
Страница 27: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 16 F105A Hold Down and Jacking Bolt Locations...
Страница 29: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 18 F104A Hold Down Jacking Bolt Locations...
Страница 30: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 19 F103A Hold Down Jacking Bolt Locations...
Страница 35: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 24 Machine Dimensions Left Side View...
Страница 43: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 32...
Страница 99: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 12...
Страница 102: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 15...
Страница 105: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 18...
Страница 106: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 19...
Страница 115: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 28...
Страница 116: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 29 7119V Dual Axis Table Assembly...
Страница 189: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 2 Grease Cross Reference Chart...
Страница 190: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 3...
Страница 191: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 4...
Страница 192: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 5...
Страница 196: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 9 Lubrication Locations...
Страница 197: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 10 Lubrication Locations cont...
Страница 199: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 12 Air Line Diagram...
Страница 212: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 25 Locate opening in the belt housing...
Страница 216: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 29...
Страница 217: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 30...
Страница 226: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 39 3 Go to Setup Electronics Control...
Страница 246: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 59...
Страница 253: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 66 Z Axis Lower Bearing and Belleville Washer Stacking Order...
Страница 254: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 67 Z Axis Lower Bearing and Belleville Washer Section View...
Страница 261: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 74 Inner Spindle Lower Section Bearing Section View...
Страница 266: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 1 Machine Parts Front Sheet Metal...
Страница 267: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 2 Rear Left Sheet Metal...
Страница 268: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 3 Right Rear Sheet Metal...
Страница 269: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 4 Air Control Door...
Страница 270: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 5 Air Control Solenoid Pack...
Страница 271: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 6 Oiler Door...
Страница 274: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 9 Enclosure Inside Parts...
Страница 275: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 10 Enclosure Panel...
Страница 276: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 11 DIN Rail Components...
Страница 277: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 12 650 1 27X Computer Enclosure Assembly...
Страница 278: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 13 Computer Components...
Страница 279: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 14 Spindle Base Right Side...
Страница 280: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 15 Spindle Base Left Side...
Страница 281: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 16 Counterbalance Cylinder Pop Off Valve Assembly Parts...
Страница 282: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 17 Motor Housing Parts...
Страница 283: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 18 Z Axis Motor Parts...
Страница 284: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 19 Counter Balance Pulley Parts...
Страница 285: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 20 Spindle Motor Housing Parts Outside...
Страница 286: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 21 HSK Upper Spindle Housing Parts...
Страница 287: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 22 Spindle Motor Housing Parts Inside...
Страница 288: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 23 Upper Spindle Ballscrew Parts...
Страница 289: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 24...
Страница 290: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 25 Lower Spindle Ballscrew Parts...
Страница 291: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 26...
Страница 292: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 27 Inner Spindle Lower Section Parts...
Страница 293: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 28 HSK Drawbar Upper Section Parts...
Страница 295: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 30 Column and Spindle Base Retainers...
Страница 297: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 32 Pendant Swing Arm...
Страница 298: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 33 Pendent Swing Arm Assembly Parts List...
Страница 299: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 34 Pendant Components...
Страница 300: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 35 Main Base Parts...
Страница 301: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 36 X Axis Assembly Drive End Parts...
Страница 303: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 38 Chip Shield Assembly...
Страница 304: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 39 Front Cover and Lights...
Страница 305: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 40 Oil Line Diagram...
Страница 307: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 42...
Страница 309: ...Section 9 Options F103 4 5A Manual www rottlermfg com 9 2...
Страница 311: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 2...
Страница 312: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 3...
Страница 313: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 4...
Страница 314: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 5...
Страница 315: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 6...
Страница 316: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 7...
Страница 317: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 8...
Страница 318: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 9...