User Manual
PCS 200 Kit
- 3.23 -
Field
Values range
Description
1
…
.
It enables the automatic tramline function.
2
6 - 100
Total length of the sequence to be covered on the field or on
a portion of it. Indicated as the number of rows.
3
…
.
Counter for the estimated number of passages that will be
necessary for that field.
4
…
.
It allows to manually go back in the sequence. Only enabled
in
“
Pause
”
5
…
.
It allows to manually go forward in the sequence.
Only enabled in
“
Pause
”
6
…
.
Display of the total length of the sequence to be covered on
the field or on a portion of it.
Displayed as the number of rows.
7
…
.
8
1 - 32
It displays the machine length.
Basic settings and indication for the tramline application
Unlike other solutions, the proposed system has been designed as generically as
possible, thus it is not only linked to the passage with the weeding bar.
The operation and the parameters setting is based on the
“
row
”
unit and not on the
dimensions in meters (for ex. the width of the weeding bar and so on); this happens
because the row separation system requires in any case that the minimum unit which
can be considered for the row separation is the single row.
It is therefore obvious that the
“
length
”
of the sequence to be repeated is defined as
the number of rows. In our example, 32 total rows.
Once the sequence has been defined, it is necessary to decide the seeder position at
the first passage, with respect to the sequence. This operation is performed by
means of the buttons placed at the beginning and at the end of the graphical total
sequence display, as shown below.
This allows, for example, to align row 1 on the seeder to row 1 in the sequence
(beginning of the field) if desired.
As regards the basic adjustments to be carried out before the beginning of the job,
you can decide whether the first one is an advance or return passage. It is possible
to make this adjustment by clicking directly the tractor icon with the following result:
Содержание PCS 200
Страница 1: ...PCS 200 Installation Operation Maintenance ORIGINAL INSTRUCTIONS ...
Страница 4: ......
Страница 33: ...Installation PCS 200 Kit 2 13 Figure 2 Wiring diagram of the system without alternator ...
Страница 35: ...Installation PCS 200 Kit 2 15 Figure 2 14 ECU wiring diagram ...
Страница 41: ...Installation PCS 200 Kit 2 21 This page is intentionally left blank ...
Страница 102: ...User Manual PCS 200 Kit 3 61 This page is intentionally left blank ...
Страница 105: ...Maintenance and Troubleshooting PCS 200 Kit 4 3 4 4 SPARE PARTS ...
Страница 111: ...Maintenance and Troubleshooting PCS 200 Kit 4 9 This page is intentionally left blank ...