INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
68 / 130
13.
Position the contact springs over the flexible
connectors, with the tip on the opposite side from the
connection sleeve, as if the contact spring is an arrow
pointing in the direction the connection sleeve will be
moved to cover the bus bar connection (Fig. 60). Insert
the bolt/conical spring washer/contact springs through
the flexible connector and the bus bar flange. From the
opposite side of the bus bar flange, push the remaining
flexible connectors onto the bolts.
14.
Apply (with a
clean
brush) a thin layer of Gleitmo
815 grease to all of the bolt threads.
15.
Slide the
opposite
side contact spring onto the
proper bolts, parallel to the first contact spring.
16.
Slide the conical spring washers over the threads
of the bolts through the contact springs (dome towards
the nut, concave towards the contact springs), and the
other appropriate washers over the remaining bolts.
When viewed from the side, the one side will be a
near mirror image of the other.
17.
Screw the nuts onto the bolts.
Fig. 61: Copper-copper connection
18.
Using a socket spanner and spanner, gently
tighten the bolts and nuts, taking up the slack (Fig. 61)
(will tighten to specified torque later).
4.7.1.2.3
INSTALLING FLEXIBLE
CONNECTORS AND
CONTACT SPRINGS:
OTHERS
Additionally to the major connection types Al-Cu and
Cu-Cu, which were described in the two previous
chapters, there a more connections that are summed
up in this chapter.