INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
82 / 130
4.7.2.3
ALIGNING THE
CONNECTION SLEEVE PIPE
Personnel:
Installation Staff
Protective Equipment:
Occupational Safety Clothing
Protective Gloves
Safety Footwear
When aligning the connection sleeve pipe, adhere to
the dimensions in the connection sleeve drawing.
Once the connection sleeve is at height of the contact
springs, it is only allowed to move the connection
along (axially to) the bus bars and must not be turned
along their own axes. If this is desired, e. g. to turn the
rating plate into a visually better position, the
connection sleeve must be first moved away from the
contact springs along the bus bars to be able to turn
the connection sleeve.
Fig. 88: Positioning the connection sleeve
pipe
1.
Clean the bus bar elements in the area of the
connection sleeve before moving it to prevent
contaminants (dirt, debris) from getting inside the
connection sleeve.
2.
Move the connection sleeve pipe to its final
position.
The middle of the connection sleeve must be
positioned exactly over the middle of the flexible
connectors (
Fig. 89: Spring contacted
3.
Visually verify both contact springs make
contact with the contact tube on the interior of the
connection sleeve (Fig. 89).