APPENDIX
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
113 / 130
Hand-held tools
….
No Designation
Comment
1
Open-end spanner
………………………
6-27 mm width across flats
2
Ratchet ring spanner
……………………. 13-17-19 mm width across flats
3
Socket set ………………………………... Ratched box
4
Hexagonal offset screwdriver ………….. Hex key
5
Torque spanner (0-50 Nm / 50-200 Nm)
Calibrated!
6
Socket inserts (nuts) ……………………. min. 13-17-19-24
7
Hacksaw with blades for metal
8
Files for metal (aluminium)
9
Crimping tool for cable lugs ……………. For wire 50 mm² + 16 mm²
10
Side cutter ……………………………….. For wire 50 mm² + 16 mm²
11
Cable stripper ……………………………. For wire 50 mm² + 16 mm²
12 Vice, mobile
13 Screw clamps
14
Pipe cutter for plastic …………………… PVC reinforced pipe
15 Plastic hammer
16 Rubber hammer
17 Steel hammer
18 Mallet
19 Screwdriver set
20 Cross-head screwdriver set
Auxiliary tools
……
No Designation
Comment
1
Pulley or chain hoist ……………………
min. up to 500 kg
2
Slings
3
Ratchet Slings
…………………………... Various sizes
4
Work and assembly bench
5
Grinding sponge or fleece
6
Steel brush
7
Installation ladders
8
Cleaning agent …………………………... Acetone or similar
9
Lint-free cloths
10 Paper towels
11 Bucket
12 Broom and dust pan
13 Refuse bags
14
PE hose or similar ………………………. Protection from soiling
15 Cable ties
16 Barrier tape
17 Protective gloves
18 Scaffolds and means of transport to suit
specific project