INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
55 / 130
Required tools and components
………
Fig. 33: Overview of material and tools
The following tools are required for installation:
Spanner, 19 mm width across flats, also 18 mm as necessary
Spanner, 17 mm width across flats, also 16 mm as necessary
Spanner, 13 mm width across flats
Socket spanner with nut, 19 mm width across flats, also 18 mm
as necessary
Torque spanner (calibrated)
Grinding sponge or grinding fleece (3M, red)
The following consumables are required for installation:
Acetone and a lint-free rag
"Gleitmo 815" high-performance grease paste
PFISTERER contact grease compound P1
Preparing the flange connections
.........
Personnel:
Installation staff
Protective Equipment:
Occupational safety clothing
Safety goggles
Protective gloves
Safety footwear
Materials:
Grinding sponge or grinding fleece
Lint-free rag
1.
Remove the transport securing device from the
flange connections (Fig. 34).
2.
Remove the transport securing device from the
bus bar (Fig. 34).