INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
78 / 130
4.7.2.1.2
PREPARATION ON BOTH
SIDES
Installing the ring seal unit
……………..
Fig. 80: Overview of the individual parts
The following tools are required for installation:
Spanner 13 mm
Gleitmo 815 high-performance grease paste
The following components are required:
Washers
Sealing ring
Bolts and nuts
Personnel:
Installation Staff
Protective Equipment:
Occupational Safety Clothing
Protective Gloves
Safety Footwear
Two ring seal units are required for each outdoor
connection sleeve.
Fig. 81: Ring seal unit assembled
1.
Assemble the ring seal unit as per the
installation drawing. In the process, grease the bolts
with Gleitmo 815.
When assembling, make sure the bolt for the earthing
is positioned opposite the nuts (Fig. 81/1).
2.
Tighten the nuts so the sealing ring does not
become deformed.