INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
38 / 130
Improper installation / assembly
……
NOTICE!
Risk of material damage due to improper
installation!
Improperly performed installation and assembly work
can cause considerable material damage.
– Protect connection sleeves and bus bars
from all climatic influences before and during
installation.
– It is imperative to adhere to all the
dimensions specified in the drawings in
order to prevent any insulation damage.
– Install bus bars properly. In the process,
make sure that no components fall or topple
over.
– Adhere to the stipulated tightening torque
values for bolts.
– Never stand on or load connection sleeves
and bus bars in any other way during
installation.
– Install bus bars so that they are free from
mechanical strain.
– Make sure the system is properly earthed.
– Make sure that all installation work is carried
out and completed in accordance with the
specifications and information in these
instructions and the specific project
drawings.
– In case of any doubts or problems during
installation,
always consult RITZ Instrument
Transformers GmbH.
Recommendation:
After installation, perform a high voltage test to ensure
the system is properly insulated.
This does not check that the installation has been per-
formed properly! It is merely a check of the insulation!
The current load capacity is not assessed in this case!