10 February 2005
TRAY HEATER
1-69
Ins
ta
lla
tion
7. Remove the oil tank [A].
NOTE:
Hang the left oil pipe [B] in the notch [C] in the controller box. Then, oil
does not fall from the pipe to the floor.
8. Connect the two connectors [D].
9. Install the oil tank at its initial position.
NOTE:
When you install the oil tank, make sure that the position of the mark
[E] on the oil pipe is as shown in the diagram above. If you do not do
this, the oil is not correctly supplied to the fusing unit.
10. Connect the heater cable to the ac cable [F].
11. Reassemble the machine.
B156I531.WMF
B156I551.WMF
[A]
[D]
[E]
[F]
[C]
[B]
Содержание TH-C1b
Страница 1: ...Model TH C1 Machine Code B156 B220 SERVICE MANUAL 10 February 2005 Subject of change...
Страница 95: ...SCANNER UNIT 10 February 2005 3 4 B156R999 JPG...
Страница 341: ......