11. Adjust the lamp heater position so that the lamp intensity sensor fiber
optics cable can be properly installed. Confirm that the transparent part of
the lamp is at the center of the heater opening (see figure).
12. Reinstall the end of the fiber optics cable [A] and fix the cover [B]
(1 screw).
13. Reassemble the machine.
14. Perform the process control initial setting in the SP test mode
(see Service Program section).
[B]
[A]
A171R575.img
A171R574.img
OPTICS
31 July 1995
5-8
Содержание FT8680
Страница 3: ...SECTION 1 OVERALL MACHINE INFORMATION ...
Страница 8: ...MEMO 31 July 1995 SPECIFICATIONS 1 5 ...
Страница 23: ...6 5 IMAGE OVERLAY MODE 2ND SIDE A171V505 wmf PAPER PATH 31 July 1995 1 20 ...
Страница 24: ...SECTION 2 DETAILED SECTION DESCRIPTIONS ...
Страница 133: ...Timing Chart 1 Stack 2 Paper Feed A171D551 wmf A171D552 wmf 31 July 1995 DUPLEX 2 109 ...
Страница 159: ...SECTION 3 INSTALLATION ...
Страница 177: ...SECTION 4 SERVICE TABLES ...
Страница 229: ...SECTION 5 REPLACEMENT AND ADJUSTMENT ...
Страница 362: ...SECTION 6 TROUBLESHOOTING ...