08.
first power on
08.01. introduction
08.02. activity
08.03. washing
after having unpacked the vending machine, arranged it firmly in
the work place and connected or supplied it (machine A)
hydraulically and electrically, carry out some actions to operate it;
wash hands thoroughly with water and soap before
handling the machine and the products; only use potable
water to clean the components;
open the door, lift the cover, power on the main switch of the
machine (see 05.11.);
for E versions pour a small quantity of coffee beans into the coffee
hopper to avoid displaying the no coffee message; never forget to
pull the coffee hopper blade;
attention
arrange a cup beneath the nozzles;
insert and rotate the service key into the door switch (see 05.15.);
attention
the vending machine is supplied and running to all effects; the
mobile parts of the coffee brewer will be handled; act extremely
carefully;
at the end of the assembly and final inspection, discharge the
water used for tests from the machine; at the time of the first
power on, fill in the whole water circuit; the machine will constantly
load water and display:
wait for the water to come out of the dispensing nozzles for some
seconds; the water flow will automatically stop and the display
show:
water will start heating in the boiler to reach the temperature value
you have set up (see 09.01.e.); at the end of this phase, the
display will show the message:
transportation, storage and installation conditions can not provide
for immediate utilisation of the vending machine and it is
recommended to perform a complete wash cycle before using the
vending machine;
press the programming button (see 05.16.); the display shows
alternatively the messages:
attention
the vending machine is supplied and running to all effects; the
mobile parts of the coffee brewer will be handled; act extremely
carefully;
arrange a cup beneath the nozzles; the machine will dispense a
pre-fixed water quantity for each wash cycle;
press “4” to enable the wash cycle of the water circuit (boiler,
tubes, mixing bowls, ….);
the display shows:
- in the E version, key “1” will dispense water through the coffee
unit; selection “2” will do it in the mixing bowl for
instant products; selection “3” in the hot water outlet hole to the
cup;
- for the I version, keys “1”, and “2” will dispense water into the
two mixing bowls for instant products; selection “3” in the hot
water outlet hole to the cup;
prima accensione
Espresso
Barista
by
MAN1920124 rel. 01 dated 23.09.2011
page no. 25 of 48 pages
OFF 09
no coffee beans
3= FREE VEND
1= PROGRAMMING
5= MAINTENANCE
2= DATA 4= CLEAN
wait
refilling water
sel. 1-2-3
cleaning
please wait
switching on…
INSTALLATION
installation
end
temperature
wait
Содержание barista XX
Страница 49: ......