![Rheavendors Group barista XX Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/rheavendors-group/barista-xx/barista-xx_installation-and-maintenance-manual_1451222047.webp)
add. 10.04. out of order
temporary
add. 11.
solution of problems
OFF 31A
OFF 31B
OFF 31C
add. 13.08. remove
water
Light varie
water temperature
high
water temperature
low
temperature probe
MAN1920124 rel. 01 dated 23.09.2011
page no. 47 of 48 pages
if the vending machine should be inactive for a long period, please
act as follows:
- perform the uninstall cycle (see add. 09.01.f.);
- detach the water and energy supply;
- empty the drip tray;
- empty and clean the product canisters and the coffee brewer;
- clean the internal and external surfaces by using a wet piece of
cloth;
- cover the machine by means of a cloth;
- store it in a sheltered place, at a temperature not below 5
°
C, at
a relative humidity not above 80%;
just as for the other chapters, error messages have the same
meaning as those already mentioned above, except for the
differences here below:
the pressure boiler temperature has exceeded the one you have
programmed (see add. 09.01.e.); replace the temperature probe;
the device of the CPU board is not working according to control;
replace the CPU board;
temperature safety devices tripped (clicsons, thermofuses, …);
restore or replace them; heating element not supplied or not
operating; check the connections and continuity of the heating
element; if necessary, replace it;
temperature probe interrupted; connector to the board, wiring;
make sure that the cable between the probe and the CPU board is
not interrupted or replace the probe;
activate the “deinstallation” cycle (see add.09.01.f.);
light
by
Содержание barista XX
Страница 49: ......