background image

INSTALLATION AND MAINTENANCE MANUAL

Original instructions 

MAN1920124 rel. 01 dated 23.09.2011

_________________________________________

www.rheavendors.com 

copertina

type: XX

Содержание barista XX

Страница 1: ...INSTALLATION AND MAINTENANCE MANUAL Original instructions MAN1920124 rel 01 dated 23 09 2011 _________________________________________ www rheavendors com copertina type XX ...

Страница 2: ...2 Company names implementation of safety warnings general information and maintenance 23 09 2011 01 First issue 17 11 2010 00 DESCRIPTION DATE REL notes by MAN1920124 rel 01 dated 23 09 2011 page no 2 of 48 pages ...

Страница 3: ...ligence or carelessness non observance of the instructions for the operation of the machine incorrect installation or maintenance by unauthorised personnel transport damage or any circumstance anyway not due to the manufacturing defects of the machine are not covered by guarantee the installation and connection with supply plants as well as the maintenance operations mentioned by the installation ...

Страница 4: ...ng machines CEI EN 60335 2 75 A12 EN 60335 1 2002 A1 2004 A2 2006 A11 2004 A12 2006 A13 2008 A14 2010 60335 1 EC 2010 EN 60335 2 75 2004 A1 2005 A11 2006 A2 2008 A12 2010 EMC EN 55014 1 2006 A1 2009 EN 55014 2 1997 A1 2001 A2 2008 EN 61000 3 2 2006 A1 2009 A2 2009 EN 61000 3 3 2008 EMF EN 62233 2008 manufacturer of the machine Rheavendors Industries S p A Via Garavaglia 58 21042 Caronno Pertusella...

Страница 5: ...e indicated and described not in the manner you expect in this case do not hesitate to contact us telephone 0039 02 966 551 fax 0039 02 96 55 086 e mail rheavendors rheavendors com ATTENTION this label applied next to the serial number label inside the vending machine points out that the instructions supplied by this manual must be carefully read before the installation and operation of the vendin...

Страница 6: ...achine to specify the parts on which to act with the outmost care the symbol recommends the utmost attention during the actions described the use of the service key intended to activate all machine functions when the door is open is only reserved to the technical operators who know the operation of the vending machine who are aware of potential risks and who make sure they are operating on totally...

Страница 7: ...the vending machine be used by children or by people with poorer physical sensorial or mental capacities or who have not been properly informed on correct use children shall be supervised to prevent them from playing with the vending machine if you should find out a water leak or the presence of smoke immediately detach the vending machine from the electric and hydraulic network never try to resto...

Страница 8: ...machine air break with overflow and level switch in the instant machine in the espresso machine max three according to the machine configuration max two in the instant version max one in the espresso version according to the machine configuration max two in the instant version max one in the espresso version according to the machine configuration instant machine open top boiler espresso machine he...

Страница 9: ... relative humidity electric consumption power vending fase the complete data according to the EVA EMP Energy Measurement Protocol are made available upon request see 02 03 the power supply cable supplied with the vending machine shall not be altered under any circumstance in case of loss or damage replace it by using an original component only make sure that the electric installation can deliver t...

Страница 10: ...chines of the Barista range Rheavendors Industries S p A has got a series of accessories manufactured for these machines such as cabinets autonomous water supply kits Rheavendors Services S p A is at disposal for any kind of support and information on special configurations see 02 03 04 configurations 04 01 a instant b instant and espresso c product canisters d water supply e numbering 04 02 examp...

Страница 11: ... 15 20 seconds after the second milk dispensing cycle in the cup the data supplied by the table provide for a latte macchiato dispensing cycle and they can be adapted to achieve dispensing cycles more suitable for the users wishes 04 04 LM selection LM by MAN1920124 rel 01 dated 23 09 2011 page no 11 of 48 pages parameters values 1st milk parameters time prod n 24 start delay prod n 5 water time n...

Страница 12: ...splay by 05 02 selection keyboard 05 09 drip tray 05 07 dispenser MAN1920124 rel 01 dated 23 09 2011 page no 12 of 48 pages 05 03 selection label pocket 05 06 orange light indicator flap support for cups 05 05 light blue panel in instant product machines rail stop cups 05 06 light blue light indicator ...

Страница 13: ...vice key 05 15 door switch 05 08 door lock 05 24 closing baffle MAN1920124 rel 01 dated 23 09 2011 page no 13 of 48 pages 05 17 flash key connection 05 06 light indicator power supply 05 05 neon power supply 05 09 waste water discharge 05 38 d coffee unit chamber heating connection 05 35 coffee hopper presence switch 05 20 coffee unit lock lever 05 19 grinding regulation 05 27 mixer motor 05 22 co...

Страница 14: ...hanger 05 27 mixer motor 05 31 environment aspirator 05 12 fuses 05 11 power on switch 05 10 electric connection by 05 38 c expansion board 05 25 product motor 05 34 heat exchanger pump boiler outlet hose 05 14 water inlet solenoid valve 05 30 powder aspirator 05 14 water inlet solenoid valve MAN1920124 rel 01 dated 23 09 2011 page no 14 of 48 pages toroidal transformer ...

Страница 15: ...chine cabinet after having extracted the slide of hydraulic components from the cabinet some internal parts can be easily inspected and accessed e g if the machine is disassembled this way you can easily set up the right phase of the coffee unit which shall be exactly in the position of the picture during the brewing phase the central articulation of the connecting rod shall be moved backwards by ...

Страница 16: ...onte e retro solubile by 05 14 water inlet solenoid valve 05 38 a CPU 05 12 fuses 05 10 electric connection 05 11 power on switch 05 25 product motor 05 27 mixer motor 05 31 environment aspirator 05 30 powder aspirator 05 37 pump motor 05 37 boiler 05 13 water drain plug 05 29 internal water tank MAN1920124 rel 01 dated 23 09 2011 page no 16 of 48 pages 05 06 light indicator power supply 05 05 neo...

Страница 17: ...be arranged in a door compartment the panel is orange in the espresso machine and light blue in the instant machine a light indicator is blinking colours as above during the dispensing cycle of drinks the Barista vending machine has got a fixed drink dispenser on the cup support surface the door is closed by means of a lock the key is mapped and numbered for identification it collects all residual...

Страница 18: ...llects over sixty ground doses in E machines after having used them in the coffee brewer a software option see 09 01 n will show a warning message as soon as the tray is full instant product canisters dispense their content in the underlying mixing bowls an internal worm screw driven by the product motor will push the instant product to the product slide they can be equipped with a wheel and a sti...

Страница 19: ...pirated air is ejected through the slots of the rear panel to aspirate the air from the internal environment of the machine to avoid any condensate in E machines it accumulates water for conveyance to the heat exchanger the level is controlled by a switch operated by a floater and if higher than established it will flow back to the safety device of the inlet solenoid valve thus preventing further ...

Страница 20: ...e 03 16 the water quantity of instant selections is established by the time set in the water N parameter see 09 01 a 05 36 espresso machine heat exchanger boiler boiler pumps 05 37 instant machine presentazione pump name sw outlet P1 water 1 hot water P2 water 2 mixing bowl P2 P1 thermofuse clicson level probe clicson water inlet water outlets temperature probe level probe by pump name sw outlet P...

Страница 21: ...as not to hamper any removal of the probe the boiler heating element led turns on whenever the boiler heating element is activated the two fuses protect the 5 V and 24 V board power supply the display board secured inside the door will accommodate the signals of the selection keyboard and display the messages a flat cable will connect it with the CPU see 05 04 the expansion board in E machines onl...

Страница 22: ...ash key may be of great use the key can contain either software or both of them and provide for a rapid and safe transfer please note that the flash key used for these software handlings must have been previously initialised with RheAction for example in general the transfer procedure is power off the machine insert the flash key into the corresponding connector see 05 17 power on the machine by m...

Страница 23: ...h of people from outside in particular of children because they represent a potential source of danger only specialised companies may be charged to provide for the disposal of package components the vending machine shall be arranged for work in a sheltered room by using a support suitable for the weight of the machine see 03 02 its distance from the walls shall provide for good air circulation and...

Страница 24: ...he following Internet address http eur lex europa eu directive 98 83 EC of 03 11 1998 observe the rules on connections with the electric network in particular on grounding connect the machine permanently without using any reduction adaptor multiple socket or extension use the network connection cable supplied with the vending machine only it is recommended to install a switch detaching the machine...

Страница 25: ...isplay show water will start heating in the boiler to reach the temperature value you have set up see 09 01 e at the end of this phase the display will show the message transportation storage and installation conditions can not provide for immediate utilisation of the vending machine and it is recommended to perform a complete wash cycle before using the vending machine press the programming butto...

Страница 26: ...d to the canister labels fill in the coffee hopper in E machines with coffee beans close the canisters and the coffee hopper with their upper covers rotate the baffles of the product slides see 05 24 to open them and pull the orange blade intended to close the coffee hopper in the E machine see also 10 to clean and treat food products properly refer to the content of the following Internet address...

Страница 27: ... to the usual operation of the vending machine and to store all changes you have made the display will show press the key PROG press 1 the buttons of the selection keyboard will assume the following functions the items are scroll by means of key 1 contains the variable composing selection 1 contains the variables composing selection 8 option not to be considered option not to be considered option ...

Страница 28: ... no product N will be dispensed you can carry out a time test on the set point see 13 19 if the time you have programmed is other than zero the N product motor will be activated at the expiry of the delay time you have programmed the delay time is increased or decreased by pressing keys 4 and 5 the rotation time of the product motor can be briefly interrupted one or two times during the dispensing...

Страница 29: ...ed of the second milk dispensing cycle to repeat the selection by N times automatically and produce drinks of remarkable volume jug press 4 and 5 to choose the drink name to display during the dispensing cycle options are listed here below standard the display will show drink N under preparation list of names of drinks made available in the machine memory the display will show drink name under pre...

Страница 30: ...keys 4 and 5 by 30 the change concerns all the activations of the pumps for all selections the time required to start the grinder motor can be tuned by 30 with respect to the setup of every single selection once established this increase or decrease is active for each activation press key 2 to access diagnostics and program the machine keys 4 and 5 to display the water temperature value of the hea...

Страница 31: ...ng of the twenty errors last occurred in the machine press key 2 to scroll the records and key 4 to reset the recording see 11 each product motor can be assigned a time credit in seconds that will be decreased at each dispensing cycle of that product after having used up the credit the machine will answer selection not available whenever a request is made for that product this control is disabled ...

Страница 32: ...spensing cycles you have performed in succession just as in 09 01 h option not to be considered choose this option and press 1 2 or 3 to enable the vending machine to dispense a pre fixed water quantity to wash the corresponding circuit see 08 03 the display shows to carry out the same functions as those described by point 09 01 n the values of the variables composing the machine programming confi...

Страница 33: ...card totale sel total sel happy total sel free partial selections total selections beep time decimal number first installation tuning pump tuning grinder partial test message number coin mech pr LM see details 04 04 water time n inhibited machine code a machine code b sales audit coffe water exp 1 PROG 1 button n functioning diagnostics enable disply temp access code total money partial money tota...

Страница 34: ...d it is compatible with human health and the supply of foodstuffs reassemble all the parts you have cleaned after having dried them by means of a clean piece of cloth refer to the content of the Internet address http ec europa eu food food biosafety hygienelegislation index_en htm this site is intended to supply the European Parliament recommendations for properly and safely processing foodstuffs ...

Страница 35: ... cloth remove any trace of residue from the surfaces inside the door above all in the proximity of the cup station carefully make sure that the motors of the two aspirators can freely rotate and have no obstacles or obstructions make sure that the corrugated tube connecting the powder aspirator and the aspiration drawer is clean and free of any product deposit E close the slides remove the caniste...

Страница 36: ...ng machine should be inactive for a long period please act as follows in E machines perform the uninstall cycle see 09 01 e in I machines set the boiler water temperature to zero detach the water and energy supply in I machines empty the boiler empty the liquid waste tray and the internal water tank empty and clean the product canisters clean the internal and external surfaces by using a wet piece...

Страница 37: ...y and grinding degree of coffee shall cause the machine to brew for about 10 15 seconds electrically and mechanically check the switch controlling the coffee brewer rotation the control cam the brewer rotation motor and its crank make sure that the brewer has properly positioned against the support wall check the operation of the micro switch operated by the presence of the brewer there is a contr...

Страница 38: ...he heat exchanger temperature has exceeded the one you have programmed see 09 01 e replace the temperature probe the device of the CPU board is not working according to control replace the CPU board temperature safety devices tripped restore or replace them heating element not supplied or not operating check the connections and continuity of the heating element if necessary replace it temperature ...

Страница 39: ...xer 1 3 04 cappuccino water exp 45 prod 2 22 delay prod 2 8 water 1 35 mixer 1 50 delay mixer 1 3 05 capp ciocc water exp 45 prod 1 10 delay prod 1 20 prod 2 22 delay prod 2 7 water 1 35 mixer 1 55 delay mixer 1 3 06 latte macchiato water exp 30 prod 2 36 delay prod 2 8 acqua 1 50 mixer 1 65 delay mixer 1 3 07 chocolate prod 1 40 delay prod 1 10 water 1 60 mixer 1 80 delay mixer 1 3 08 hot water w...

Страница 40: ...ow access the w ring of the motor shaft the water inlet gaskets of the mixing bowl and the mixing bowl gaskets remove the silicone tubes intended to dispense the product turn the orange ring nut clockwise and pull the mixing bowl body unscrew the crosshead screw and extract the motor the power supply wires can be removed without any tool remove the product canister access the rear part of the mach...

Страница 41: ...e to extract the residual powder of instant products from inside the machine see 05 30 it is recommended to use the value in minutes you have already programmed three if you should use particularly volatile products increase the time to five and more minutes after having opened the rear panel of the machine never forget to connect the knurled suction tube with the rear bush of the fan to check the...

Страница 42: ...02 04T silicone hose 10 14T symbol T1 T2 T3 T4 T5 T8 column name coffee brewer mixer 1 nozzle support drip tray 90 joint short insert symbol GC M1 ER VRG IN9 IFC column 7 4 5 7 7 6 6 name volumetric counter pump ex 5 non return valve by pass heat exchanger three way valve symbol CV MP NR BP SC EX column 4 5 5 6 6 6 name water internal tank water inlet solenoid valve water inlet solenoid valve air ...

Страница 43: ... symbol P3 M1 M2 ER VRG IN9 column 3 4 5 4 4 4 name water inlet solenoid valve water inlet solenoid valve water internal tank boiler boiler pump 1 boiler pump 2 symbol EVA VIA SA BO P1 P2 column 2 3 2 3 3 3 L E G E N D 7 7 6 6 5 5 4 4 3 3 2 2 1 1 by R A T8 EVA VRG ER T4 T2 T2 T4 T4 T4 T4 T4 T1 BO P1 P2 P3 M1 M2 T8 IFC IN9 T8 ER ER T4 T2 T2 T4 T4 T4 BO P1 P2 P3 M1 M2 T4 T4 VIA VRG SA IFC IN9 MAN192...

Страница 44: ... Barista which has been described as far as here the most important technical difference is that water is produced by one single 400 ml pressure boiler for all dispensed selections i e instant and espresso ones however the information supplied by the previous pages are also applicable for this machine version and you can make reference to them when using Barista Light attention all the cautions al...

Страница 45: ...ixing bowl EX coffee water coffee brewer add 05 presentation clicsons water inlet hot water drain tap instant solenoid valves three way valve to coffee brewer EX E1 E2 to mixing bowl temperature probe 05 10 electric connection 05 14 water inlet solenoid valve 05 12 fuses 05 38 a CPU 05 31 environment aspirator 05 23 product motor 05 38 c expansion board 05 11 power on switch add 03 20 pressure boi...

Страница 46: ...l architecture of the two machines since Barista Light has got one single boiler to dispense all selections i e espresso and instant ones the chapter temperature includes a variable intended to determine the boiler water temperature with the options first coffee definition and heating time whose functions are explained later on use keys 4 and 5 to change the boiler temperature press 2 to display t...

Страница 47: ...erature not below 5 C at a relative humidity not above 80 just as for the other chapters error messages have the same meaning as those already mentioned above except for the differences here below the pressure boiler temperature has exceeded the one you have programmed see add 09 01 e replace the temperature probe the device of the CPU board is not working according to control replace the CPU boar...

Страница 48: ...e hose 07 11T ptfe hose 02 04T symbol IN9 IFC T1 T2 T3 T4 T5 column 6 7 name three way valve soluble solenoid valve 1 soluble solenoid valve 2 coffee brewer mixer 1 nozzle support drip tray symbol EX E1 E2 GC M1 ER VRG column 5 5 5 6 7 7 7 name water inlet solenoid valve air break volumetric counter pump ex 5 non return valve by pass pressure boiler symbol EVA AB CV MP NR BP CA column 1 2 3 4 4 4 ...

Страница 49: ......

Отзывы: