RVF 327, 327 S, 330, 330 S
ex no. 1200
Transport, set up, installation
Version 1.5
page 33 of 144
-
Inspect switch
The position of the top plate and the hopper flap will be checked through the
safety switch. Starting the conveyor system is only possible when the top plate is
bolted in and with the hopper being closed. (see chapter 4 Operation of the vacu-
um filling machine)
-
Attach twisting mechanism
If the Vacuum filling machine is fitted with a twisting device, then it must be
cleaned in advance, und then mounted on the machine.
-
Attach skin holding device
If the Vacuum filling machine is equipped with a skin holding device, then this
needs to be cleaned in advance, and afterwards attached to the twisting off de-
vice.