RVF 327, 327 S, 330, 330 S
ex no. 1200
Transport, set up, installation
Version 1.5
page 31 of 144
Prepared activities
Prior to the first start, the following tasks and inspections necessary:
-
comparison of line voltage and frequency
The information on the machine sign and the meter des power station must cor-
respond. Voltage fluctuation cannot /- 10 %. Greater deviations cause
malfunctions and premature deterioration. Non-adherence to these regulations
will nullify all warranties through the manufacturer.
-
inspecting rotation direction of the Vacuum pump
(Rotation direction of the main drive is given)
Open vacuum inspection glass and raise the ball at the safety ventilator. If the ball is sucked
in, then the rotation direction of the vacuum pump is correct. If the ball is not immediately
sucked in, then the rotation direction is in the false direction. In this case, the vacuum pump
must be immediately shut down and then reverse the connection wire.
Attention: In order not to damage the vacuum pump, this can only run very
briefly in the wrong direction, and only be operated briefly
against atmospheric pressure.
All electrical related work can only be carried out by electricians.
There is a danger of electrical shock! Extremely dangerous!!
-
foot switch positioning
Heights and distance adjustments are made by loosening the hexagonal screw.
Adjust the adequate position and clip on with the hexagonal screw.
Knee switch plate can be turned.
-
focus the desired language
-
set the local time
-
inspect all work programs
-
inspect the Functionality of the Vacuum filling machine
(see chapter 4 operating the Vacuum filling machine)