4. Step-by-step Guide
The following chapters will guide you step by step through preparation, installation and activation of
the RAy link:
•
Pre-installation check out
•
•
•
Pre-installation Checklist
Familiarise yourself with the controls and prepare your configuration ahead of the installation of the
link on the mast tube.
Both units (without antennas) can lie on a desk with flanges running parallel and facing up at an angle,
on a non-metal desk they can also face downward. In the case of units operating in the ISM band
(RAy17, RAy24), turn unit holder so that they are roughly perpendicular to each other. In the case of
units operating in licensed bands (RAy10, RAy11), turn unit holders so that they are roughly parallel
to each other. Use an ethernet cable to connect each of the units to a PoE source and connect a PC
to one of them for configuration.
Take the following steps to establish a connection between the PC and RAy and perform a basic setup.
27
© RACOM s.r.o. – RAy Microwave Link
Step-by-step Guide
Содержание RAy11
Страница 2: ......
Страница 167: ...Appendix B Rain Zone Map 167 RACOM s r o RAy Microwave Link Rain Zone Map...