
e.
First insert the lower row of conductors from the back. Then unwind the others and insert them
into the holes for the upper row of conductors, as per the pinout sticker. Ensure that the wrapped
around shielding braid is inserted sufficiently to create a good contact with the second part of the
connector fitted with sprung contacts. Snap the plastic clamp onto the cable. Squeeze it together
tight enough so that it doesn't allow movement of the cable.
Fig. 5.55: Lower pairs pushed in
Fig. 5.56: All conductors in the connector
f.
Trim the overhanging conductors.
Fig. 5.57: Trimming conductors
Fig. 5.58: Inserted and trimmed conductors
g.
Remove the pinout sticker from the connector and slide on the mate. Clamp the whole connector
together until the locks snap into place. Use a pair of pliers with flat heads from the
RAy Tool
set.
Ordinary pliers could damage the connector.
Fig. 5.59: Fitting the mate to the
internal connector
Fig. 5.60: Clamping the internal connector
together with pliers
RAy Microwave Link – © RACOM s.r.o.
52
Installation
Содержание RAy11
Страница 2: ......
Страница 167: ...Appendix B Rain Zone Map 167 RACOM s r o RAy Microwave Link Rain Zone Map...