
QUANTECH
96
Form QCC2-NM1
Issue Date: 5/20/2021
SECTION 5 – TECHNICAL DATA
Installation of durulene vibration isolators
LD13762B
D
D
TOP BOLT
CL
SECTION D-D
TOP WASHER
("A")
("B")
CL
("C")
("B")
1. Read instructions in their entirety before begin-
ning installation.
2. Isolators are shipped fully assembled and are to be
positioned in accordance with the submitial draw-
ings or as otherwise recommended.
3.
Set isolators on floor, housekeeping pad, or sub-
base, ensuring that all isolator centerlines match
the equipment mounting holes. The VMC group
recommends that the isolator base (“A”) be in-
stalled on a level surface. Shim or grout as re-
quired, leveling all isolator bases to the same
elevation (1/32-in. maximum difference can be
tolerated).
4. Bolt or anchor all isolators to supporting structure
utilizing base thru holes (“B”).
5. Remove top bolt and top washer. Place equip-
ment on top of isolators so that mounting holes
in equipment or base line up with threaded hole
(“C”).
6. Reinstall top bolt and washer and tighten down.
7. Installation is complete.
Figure 37 -
Installation of Durulene Vibration Isolators
Содержание QCC2015CEE
Страница 12: ...QUANTECH 12 Form QCC2 NM1 Issue Date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 38: ...QUANTECH 38 Form QCC2 NM1 Issue Date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 46: ...QUANTECH 46 Form QCC2 NM1 Issue Date 5 20 2021 Section 5 Technical data THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 102: ...QUANTECH 102 Form QCC2 NM1 Issue Date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 152: ...QUANTECH 152 Form QCC2 NM1 Issue Date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 171: ...QUANTECH 171 Form QCC2 NM1 Issue Date 5 20 2021 Notes...