SECTION 4 – SYSTEM INSTALLATION
UL EX3830 ULC EX3830
2014-NOV-10 REV. 06 PagE 4-29
KITCHEN KNIGHT II Restaurant Fire Suppression Manual
Installing Flexible Conduit Through a Conduit Offset
(Continued)
10. Push flexible conduit completely through conduit offset.
Flexible conduit should stop flush or +/– 1/2 in. (12.7 mm)
from bottom of conduit of conduit fitting in PYRO-CHEM
control head. See Figure 4-66.
FIGURE 4-66
008047
11. Tighten nut on strain relief on top of conduit riser. See
Figure 4-67.
FIGURE 4-67
008048
12. Complete the remainder of the flexible conduit and wire
rope installation to the pull station or the gas valve.
Flexible Conduit Splicing (Allowed on Pull Station
Installations Only)
Note: Wire rope cannot be spliced together, only the flexi-
ble conduit.
Flexible conduit can be spliced together using EMT Compression
Fitting Union (Part No. 79827) only for the pull connection.
1. Remove rings from both ends of compression union. See
Figure 4-68.
FIGURE 4-68
008061
2. Install strain relief nut, strain relief, compression union nut,
flexible conduit insert and compression union over the flex-
ible conduit with wire rope installed. See Figure 4-69.
FIGURE 4-69
008049